Skip to content
Nearby Septic — nearbyseptic.com · Verified septic directory · printed Nov 24, 2026
Home › Septic Guides for Texas › Texas Septic Site Evaluation (2026): What Fails a Site
Resources

Texas Septic Site Evaluation (2026): What Fails a Site

Before any septic permit in Texas, a licensed site evaluator or a professional engineer must dig or drill two test holes at opposite ends of the proposed drain field, two feet below the planned trench bottom or down to a restrictive layer, and report the soil class, any restrictive horizon, signs of groundwater, slope and flood zone (30 TAC 285.30). If one of those comes back unsuitable, a standard trench is off the table and the system has to be one the soil will accept, which in much of Texas means aerobic treatment with spray, drip, a mound or low-pressure dosing. TCEQ puts it bluntly: “In many parts of Texas, soil analyses are ruling out conventional systems.”

Rule 285.30 has not changed since September 11, 2008. Texas does not use a perc test to size systems; the perc test guide explains why the word survives.

What the evaluator does on your land

The evaluator digs or drills two holes, logs the soil layer by layer, and draws everything on a scaled site plan that goes in with the permit application. Rule 285.30(b)(1) sets the minimum: two soil borings or two backhoe pits “at opposite ends of the proposed disposal area,” taken to “two feet below the adopted excavation of the disposal area, or to a restrictive horizon, whichever is less.” Where the soil varies, the permitting authority can ask for more.

A typical field sheet shows what gets recorded. Gregg County’s form has a row for each foot of depth and columns for texture class, structure, drainage (mottles or water table), restrictive horizon and observations. The same sheet asks about the 100-year flood zone, nearby ponds and streams, any well within 150 feet and the ground slope, and it carries the evaluator’s signature and seal.

The rest of the evaluation is the site itself:

  • Slope and drainage. Every slope, depression and gully goes on the drawing (285.30(b)(3)(A)).
  • Flood zone. The 100-year floodplain is taken off FEMA’s maps; where FEMA has not mapped the tract, an engineer’s flood study stands in. The drawing must say so even when the tract has no floodplain (285.30(b)(3)(B)).
  • Features to keep clear of. Wells, water lines, property lines and surface water are located for the setback check (285.30(b)(4)). The distances themselves are in our setback guide.

Some counties go further. For a subsurface system, Fort Bend County requires “two 5′ backhoe excavations” at its pre-construction inspection, where soils are “evaluated as needed.”

The five Texas soil classes

Texas sorts septic soils into five classes, Ia, Ib, II, III and IV, by texture and gravel; there is no “Class I.” The definitions are in 285.30(b)(1)(A):

ClassWhat the rule includesLoading rate, gal per sq ft per day (Table I)Standard trench on septic-tank effluent (Table XIII)
Ia“sandy textured soils that contain more than 30% gravel”over 0.50No
Ib“sand and loamy sand soils” with 30% gravel or less0.38Yes
II“sandy loam and loam soils”0.25Yes
III“silt, silt loam, silty clay loam, clay loam, sandy clay loam, and sandy clay soils”0.20Yes
IV“silty clay and clay soils”0.1No

Class II and III soils with gravel get a sieve analysis to measure the gravel’s share and size (285.30(b)(1)(B)). The loading rate is how much effluent each square foot of absorptive area may take, and it sets the drain field’s size; the arithmetic is in our drain field sizing guide.

Restrictive horizons, rock and groundwater

A restrictive horizon is a layer the effluent cannot soak through, and the rule recognizes one by an auger that stops. Rule 285.30(b)(1)(C) names “clay subsoils, rock, and plugged laminar soils,” marked by an abrupt change from a sandy or loamy surface to “a clayey subsoil which an auger will not penetrate” or “rock-like material which an auger will not penetrate.”

A standard trench needs two feet of suitable soil beneath it before either a restrictive horizon or groundwater (285.33(b)(1)). That two-foot buffer is where shallow-rock country runs into trouble. NRCS describes the Keese soils of the Llano uplift as reaching weathered granite 10 to 20 inches down, and in Llano County the main soil of 42 of 50 mapped units rates “Very limited” for a septic absorption field.

The rock rule has one door. If the holes hit a rock horizon but find suitable soil below it and nothing wet within two feet below the trench, a standard system can still go in, provided the rock sits “at least six inches above the bottom of the excavation” and runoff along the top of the rock is kept out of the trench (285.33(b)(1)(A)(vi)).

Groundwater is judged from the soil, not from standing water. The evaluator looks for “indications of groundwater within 24 inches of the bottom of the excavation” (285.30(b)(2)), and Table V counts “drainage mottles,” the rust and gray streaks left by a fluctuating water table, as a fail.

Can you dispute the groundwater call?

Yes. When the permitting authority’s designated representative and your evaluator disagree about groundwater, the rule sends the question to the NRCS soil survey, and then, at the owner’s option, to a certified professional soil scientist. Under 285.30(b)(2)(A), the designated representative checks the NRCS survey for that county if one exists. If either side disagrees with the survey, or there is none, 285.30(b)(2)(B) lets the owner hire a certified professional soil scientist and present that finding “to the designated representative for a final decision.”

Table V: the criteria that fail a standard trench

A standard drain field needs a pass on every row of Table V (30 TAC 285.91(5)); one unsuitable row rules it out (285.31(b)).

FactorUnsuitable when
SlopeOver 30%, or complex slopes
TextureClass Ia or Class IV along the trench wall or within two feet below it (exceptions for lined evapotranspiration beds, and for pumped effluent and ET in Class IV)
Restrictive horizonIntersects the trench wall or lies within 24 inches below the bottom
GravelClass II or III soil with more gravel than the table allows; any other soil over 30% gravel
GroundwaterSeasonal groundwater or drainage mottles within 24 inches below the bottom
FloodingIn the floodplain or floodway unless designed under 285.31(c)(2); depressions without drainage
FillAny fill material

Slope under 2% is not a fail, but the design must add surface drainage controls. In a regulated floodway, a professional engineer must show the system “shall not increase the height of the flood” (285.31(c)(2)).

Table XIII: what can go in when a site fails

Failing Table V moves the job to Table XIII (285.91(13)), which lists the systems each soil and separation can accept, and most of them need secondary treatment or a design by an engineer or sanitarian. The rows that matter most on a failed site:

SystemClass IaClass IVDepth needed to groundwater / restrictive layer
Standard trench, septic tankNoNo2 ft / 2 ft
Trench with secondary treatment and disinfectionYesNo2 ft / 2 ft
Drip irrigation, secondary treatmentYes, with disinfectionYes1 ft / 6 in
Low-pressure dosing, septic tankNoYes2 ft / 1 ft
Mound, septic tankYesYes2 ft / 1.5 ft
Surface application (spray), secondary treatmentYesYesNot applicable
Soil substitutionYesNo2 ft / 2 ft

Each has its own limits. A mound needs at least one foot of native soil unless the permitting authority approves less case by case, on a slope under 10% (285.33(d)(3)(A) and (G), Table XIII note 4); the mound system guide covers the build. Spray needs a vegetated area at 15% slope or less, or steeper ground only if landscaped and terraced to limit runoff (285.33(d)(2)(A)), and it accounts for most new approvals in counties such as Denton (293 of 325 in 2025) and Johnson (824 of 868); their cost is in the aerobic system cost guide. Drip with secondary treatment “may be used in all soil classes including Class IV soils” (285.33(c)(3)). Soil substitution “must not be used in Class IV soils” (285.33(d)(4)(A)).

Anything outside the standard designs is a nonstandard system, and its plans “must be developed by a professional engineer or professional sanitarian” (285.33(d)).

Who may do it, what it costs, how long it counts

The person in the field must hold a TCEQ site evaluator license or be a licensed Texas professional engineer (285.30(a)); the evaluation is a private service with no county fee, and the state rule sets no expiry on the report itself. A site evaluator license requires TCEQ’s basic course, the examination, and an existing license as an Installer II, designated representative, engineer, sanitarian, soil scientist or soil-discipline geoscientist (30 TAC 30.240(d)(2)), plus 24 hours of training to renew. An Installer II license is a step toward the site evaluator license, not permission to evaluate. Some counties narrow the field further: Denton County and Johnson County limit evaluations to engineers and to registered sanitarians who also carry the site evaluator license.

None of the county fee schedules we checked for Travis (FY2027), Hays (2026) or Comal lists a site-evaluation fee. Prices come from the evaluator: Red Dirt Ditching and Septic in Lubbock says “Most Texas homeowners pay roughly $250 to $600,” and Texas Septic Solutions in Cleveland quotes “between $300 and $800.” The clock that does run is on the permit: the authorization to construct lapses after one calendar year unless the installer has requested an inspection (285.3(d)(1)). More on price and timing for land buyers is in the perc test guide and the land-buying septic checklist.

Even on a 10-acre tract exempt from a permit, TCEQ’s permit page says the property must receive “a site evaluation conducted by a TCEQ licensed Site Evaluator or a Professional Engineer (PE).”

Are the site evaluation rules changing?

Not yet: TCEQ’s list of possible Chapter 285 changes includes updating soil-evaluation methods and restrictive-horizon analysis, but nothing has been proposed. A TCEQ stakeholder handout from its 2023-2024 scoping lists “Update methods for evaluating soils” and “Update and clarify restrictive horizon analysis,” and TCEQ’s own page for rule project 2024-009-285-CE lists the same items among possible changes. On October 16, 2026, none of TCEQ’s four rulemaking status pages listed a Chapter 285 rule. TCEQ’s rule history shows no amendment to Chapter 285 since the March 2024 readoption. Our rule-change tracker logs the project if it moves. Licensed crews who build to an evaluation are listed under septic installation.

Texas site evaluation FAQ

How many soil borings does a Texas site evaluation need?

A Texas site evaluation needs at least two soil borings or two backhoe pits, at opposite ends of the proposed drain field. The permitting authority can require more where soils vary.

How deep do the test holes go?

The holes go two feet below the planned bottom of the drain field, or down to a restrictive horizon if one comes first. A standard trench in most of Texas is 18 inches to three feet deep (285.33(b)(1)(A)(i)), so the holes usually end up about 3.5 to 5 feet deep.

What is a restrictive horizon?

A restrictive horizon is a clay subsoil, rock or plugged layer that an auger cannot get through and effluent cannot soak through. A standard trench needs two feet of suitable soil above it.

Is clay soil an automatic fail in Texas?

Class IV clay fails a standard trench but still accepts drip, low-pressure dosing, a mound, spray, or an evapotranspiration bed under Table XIII. It rules out soil substitution and chamber or gravelless trenches.

Can I build a septic system on rock in Texas?

Yes, if the rock sits at least six inches above the trench bottom with suitable soil and no groundwater below it, or by switching to a system Table XIII allows over fractured rock. Most fractured-rock options need secondary treatment and disinfection.

Sources & Methodology

Every source on this page was read on October 15, 2026, and the rule text, TCEQ pages, county documents and provider prices were re-read on October 16, 2026. Rule text for 30 TAC 285.30 and 285.31 is from TCEQ’s own rules compilation (RG-472), which we confirmed is current against TCEQ’s Chapter 285 history page; 285.2, 285.3, 285.33 and Tables I, V and XIII are from the rule text TCEQ adopted effective July 6, 2023. Licensing requirements are from 30 TAC Chapter 30 and TCEQ’s licensing page.

Field practice comes from Gregg and Fort Bend County documents; costs from the two Texas providers named, each quoted as published; county fee checks from Travis, Hays and Comal schedules. The rewrite items are from a TCEQ stakeholder handout, not a proposal. The Hill Country soil example is from NRCS’s Keese series description.

Free septic company quotes

Get free quotes from verified septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.