Licking County issued 203 septic permits in 2025 and does not publish what one costs. That is not an oversight on our part: the health department prices its program through a fee schedule it keeps off the website, and its board approved a fresh round of household sewage fee changes on January 20, 2026 without publishing the figures. What the county does publish is the route, the soil rule that decides whether your lot can be split at all, and the abandonment permit at $50. Everything below is quoted from Licking County Health Department documents; the permit fee is a phone call to (740) 349-6475.

What Does a Septic Permit Cost in Licking County?

The installation and alteration permit fees are not published anywhere, and we will not print a number we cannot source. The fees the county does put in writing are these.

ServiceFeeSource
Sewage treatment system abandonment permit$50.00Septic System Abandonment Fact Sheet (02-2025)
Lot split review$100.00 per lot split; no fee for exempt splitsLot Split Factsheet (Rev. 3/2025)
Septic installer annual registration$200.002026 Septic Installer Registration Form
Septic service provider annual registration$250.002026 Service Provider Registration Form
Septage hauler annual registration$200.00 including one vehicle, $50.00 per additional vehicle2026 Septic Hauler Registration Form
State portion of every Ohio installation permit$74.00 new or replacement, $35.00 alterationOAC 3701-29-05(C)(3)

That last line is the one number about a Licking permit you can rely on without calling. Since January 1, 2017 every Ohio board of health has had to collect $74 on each new or replacement installation permit and $35 on each alteration and remit it to the Ohio Department of Health. Whatever Licking charges, that much of it is passing through. The county’s own permit application packets are scanned documents with no readable text layer, and the 2019 fee schedule still on the server has been superseded, so the fee desk is the only reliable source. For the cost of the system rather than the paperwork, see our cost guides.

Who Issues Septic Permits in Licking County?

The Licking County Health Department is the health district for the whole county, and its Environmental Health division runs the sewage program.

Licking County Health Department, Environmental Health
675 Price Road, Newark, OH 43055
Environmental Health: (740) 349-6475 · Main: (740) 349-6535 · Fax: (740) 349-6935
Email: environmental@lickingcohealth.org
Web: lickingcohealth.org

The scale is worth understanding before you call. The department estimates there are around 30,000 individual household and small commercial sewage treatment systems in Licking County, and says it may take twenty years to locate and enroll all of them in the state-mandated operation and maintenance program. Inspections began in 2016 in areas that had historically caused public health nuisances.

The Seven Steps, in the County’s Own Order

Licking publishes a seven-step route, and step one is not the health department. This is from the department’s guidance sheet for obtaining a household sewage treatment system permit.

  1. Get an assigned address from the Licking County Engineer’s office, (740) 670-5280. Without it there is nothing to permit.
  2. Have a soil evaluation done by a certified soil evaluator. The department points applicants at the Ohio pedologists’ directory and does not do the work.
  3. Forward the soil report to the health department along with the number of bedrooms proposed.
  4. The department returns a Leaching Design Worksheet, which is its sizing answer for your soil.
  5. Hand that worksheet to your installer, designer or engineer.
  6. Submit the design plan for review and approval.
  7. Submit the HSTS application with the appropriate fee. Card, cash, cheque or payment by phone.

The design has to carry a designer site visit, staking and flagging of the absorption area, system type, daily design flow, materials by brand and distributor, a scaled site drawing showing the test holes and the replacement area, elevations and isolation distances. At the other end of the job, the as-built matters: “Failure to submit a completed as-built drawing will result in the STS being disapproved.” Our installation guide covers the build itself.

The Local Rules That Catch People Out

Two Licking rules decide projects before the permit conversation starts: the lot-split soil gate, and a ban on new discharging aerators.

  • Lot splits. Any lot created under five acres requires a soil evaluation by a certified soil scientist, and so does a lot of five acres or more that has a determined building site. Lots of five acres or more without a determined building site are exempt, as are parcels with an existing dwelling, and any lot over twenty acres is exempt from review. The department states the consequence plainly: “A septic permit will not be issued for a lot until a soil evaluation is conducted by a soil scientist.” The county handled 96 lot-split applications in 2025 and completed 127 in 2024.
  • Discharging aerators. The department’s household sewage fact sheet states that aerators with discharge are no longer permitted to be installed for new homes in Licking County. If your builder’s plan assumes one, the plan is out of date.
  • Abandonment, Rule 17. Abandoning a system needs its own permit at $50. The tank must be pumped by a pumper registered with the department, the top removed or crushed with at least one side crushed, the void filled with clean fill, a post-work form submitted, and an inspection of the abandoned tank is required.
  • Operation and maintenance intervals. Annual for off-lot discharging systems and drip irrigation; every five years for soil-absorption systems.

The operation and maintenance program stopped being theoretical in 2026. The department mailed its first round of compliance letters in mid-January 2026: 109 letters went out, 29 properties had responded and met the requirements by late February, and homeowners were given until May to submit documentation.

Which Contractors You Can Use, and Help Paying For It

Ohio issues no septic license. Contractors register with each health district and carry a statewide surety bond on the Ohio Department of Health’s form, and Licking publishes three current lists.

As of March 31, 2026 the county listed 52 registered sewage treatment installers, 33 service providers and 35 haulers, up from 42, 29 and a similar hauler count seven weeks earlier. Registration requires proof of general liability insurance of not less than $500,000, a surety bond issued for the calendar year on the ODH bond form, the state exam for new contractors, and six continuing education credits at renewal. Licking tightened this for 2026: the bond must be ODH-approved before the department approves a registration, outstanding as-builts or pumping reports block a registration, and the department told contractors it will withhold permits and inspection requests where insurance has expired. Nobody in Ohio holds a septic license, so ask which districts a contractor is registered in and who wrote the bond. That is the check behind our listings; see how we verify.

If the system is failing and the money is the problem, ask about the department’s Water Pollution Control Loan Fund program on (740) 349-6504. Its own application states there is no cost to apply, and awards run at 100%, 85% or 50% of the job depending on eligibility, with the homeowner covering the balance and remaining responsible for operating the system afterwards.

Licking County Permit FAQs

How much is a septic permit in Licking County?

The county does not publish the installation or alteration permit fee, so call Environmental Health on (740) 349-6475 for the current figure. The board of health approved new household sewage system fees on January 20, 2026 and did not publish the amounts. What is published: abandonment $50, lot split $100, and the state portion of $74 on a new or replacement permit and $35 on an alteration that every Ohio district collects.

Do I need a soil evaluation to split a lot in Licking County?

Yes, for any new lot under five acres, and for a lot of five acres or more that has a determined building site. Lots of five acres or more without a determined building site are exempt, parcels with an existing dwelling are exempt, and lots over twenty acres are exempt from review altogether. No septic permit issues until a soil scientist has done the evaluation.

Can I install a discharging aerator on a new house in Licking County?

No. The health department states that aerators with discharge are no longer permitted to be installed for new homes in Licking County. If a plan or a quote assumes one, ask the department what it will approve on your soil before you sign anything.

How often does Licking County require a septic inspection?

Annually for off-lot discharging systems and drip irrigation, and every five years for soil-absorption systems. These sit under the operation and maintenance program Ohio has required since 2015, which the department is still working through: it estimates twenty years to enroll all of the county’s roughly 30,000 systems.

What do I do about an old septic tank I am taking out of service?

Apply for an abandonment permit and pay $50 before anything is filled in. The tank has to be pumped by a pumper registered with the department, the top removed or crushed with at least one side crushed, the void filled with clean fill, and the work inspected. Filling a tank quietly is the version that becomes a title problem later.


Sources: Licking County Health Department Sewage Treatment Program page; Guidance for how to obtain a Household Sewage Treatment System (HSTS) Permit (8/2021); Lot Split Factsheet (Rev. 3/2025); Septic System Abandonment Fact Sheet (02-2025); 2026 installer, service provider and hauler registration forms (cover letter November 3, 2025); Sewage Treatment Design Guidance and STS As-Built forms; registered installer, service provider and hauler lists dated March 31, 2026; Board of Health minutes of January 20, 2026 and February 24, 2026; LCHD Annual Report 2025 and 2024. All read August 7, 2026. Ohio Administrative Code Chapter 3701-29, effective January 1, 2015. Fees change; confirm before filing.

Ground conditions, registered contractors and the wider picture: Licking County septic hub. How permitting works elsewhere in the state: Ohio permit guides.

Hire a septic company in Licking County.

The bond-list-verified septic companies on our Licking County page are each matched to ODH records, with phone numbers and bond status.

Find Licking County septic companies
Free septic company quotes

Get free quotes from verified Licking County septic companies.