Skip to content
Nearby Septic — nearbyseptic.com · Verified septic directory · printed Nov 26, 2026
Permit guide

Collin County Septic Permit (2026): $310 Fee, Filed Online

Verified against county records · page updated October 18, 2026 · rules change — confirm with the agent before applying

A new residential septic permit from Collin County Development Services costs $310 for a non-aerobic system or $335 for an aerobic one (the fee schedule’s “w/Maintenance” line), and you file it through the county’s online self-service portal. On a new house, the county wants the development permit first ($75 on the same schedule), then sends the septic permit to the portal for completion. The county posts no review time; the state gives permitting authorities 30 days. Five cities and towns run their own programs, and the county says Dallas and Murphy handle their own septic permits.

Who issues septic permits in Collin County?

TCEQ’s registry lists eight records for Collin County: the county agent, six city or town agents, and the regional office, for a total of seven agents with a local office. Five of the six issue their own permits inside their limits. Lucas holds a registry line but routes to the county.

Collin County Development Services (TCEQ Authorized Agent 620046)
4690 Community Ave., Suite 200, McKinney, TX 75071
(972) 548-5585 · fax (972) 548-5555 · developmentservices@collincountytx.gov
7:30 a.m. to 4 p.m.; open to the public Monday to Thursday, closed to the public on Fridays

Collin County Development Services told us in writing on October 9, 2026 that the office is “open in office Mon-Thur” and closed to the public on Fridays, when staff “are still working and operating.” The county page says property outside city limits applies through the county’s portal. For a property inside a city, it may still apply, and the county sends readers to TCEQ’s list: “If your city is not listed, collin county is your authorized agent.”

Agent (TCEQ registry)CoversWhere to start
Collin CountyEntire county except the cities below, and Dallas and MurphyDevelopment Services, McKinney
City of Lucas“administered by Collin County”Same McKinney office; Lucas’s permits page sends septic approval to the county
City of FriscoCity limitsBuilding Inspections; that page does not mention septic, so call Customer Service at (972) 292-5301
Town of FairviewTown limitsOSSF program page
City of FarmersvilleCity limitsCity website
City of Royse CityCity limitsBuilding Department
City of NevadaCity limitsCity services page

Fairview is the one that changes the design. The town’s page says “all new OSSFs in Fairview are required to be Aerobic Treatment Units (ATU) by ordinance,” and new anaerobic systems are not permitted. By contrast, the county’s information sheet says it “does not require Aerobic Systems.” The five cities set their own fees, which this page does not cover.

TCEQ’s area-served line for the county excludes “Cities of Dallas & Murphy”, and no Collin-side agent appears for either in the registry. Collin County Development Services told us in writing on October 9, 2026 that “Dallas and Murphy handle their septic permits directly,” so owners in those portions start with the city. Lavon, once in the county’s list, now shows status “RESC” in the registry. The statewide authority guide explains how counties, cities, and TCEQ divide the work.

How an application starts: the portal and the development permit

For a new home, the septic permit is not a separate application: the county generates it from the development permit. The FAQ says, “do not apply for a separate development permit and ossf permit.” File the development permit in the Citizen Self-Service Portal; staff then send the septic permit through the portal for the owner to complete.

Other situations go through the portal too, and a repair touching half the system is permitted as a new one:

  • Adding to a property with a system. A new structure, an alteration, or a swimming pool where the county is the permitting authority requires “a review of existing ossf for new construction/improvement permit.”
  • After approval. Aerobic contracts, maintenance reports, and ownership changes go to the county’s OSSF Report Portal, a different site from the permit portal.

Per the FAQ, “OSSF permits expire after 365 days of no activity (from date of issuance).” The OSSF affidavit is filed with the County Clerk, 2300 Bloomdale Rd., Suite 2104, McKinney.

The county publishes no review time. TCEQ’s permit page says “the permitting authority must either approve or deny the planning materials and permit application within 30 days of receipt.” Ask the office how that clock runs for a portal submission.

What does a Collin County septic permit cost?

The FY2026 adopted fee schedule, footed September 29, 2025, prices a new residential system at $310 or $335 and a repair at $100 or $150. Each new-system line carries the note “$10 of fee goes to state,” so the state’s share sits inside those totals.

FeeAmount
New residential, “no Maintenance” (non-aerobic, per the county)$310
New residential, “w/Maintenance” (aerobic, per the county)$335
Repair, under 100 feet of line, no tank exchange$100
Repair, over 100 feet or with tank exchange$150
Review of an existing system$50
Re-inspection after a failed inspection (the first is free, per the county)$75 each after the first
Development permit, new construction$75 (includes a $15 OSSF compliance review)
Permit not issued, or applicant withdraws before inspection20% of total fee

The schedule does not define its “w/Maintenance” label; Collin County Development Services told us in writing on October 9, 2026 that “$310 is referring to non aerobic systems, $335 is aerobic.” An older county fee document, footed 8/31/2011, prints the same $310 and $335. That fiscal year ended September 30, 2026, and as of October 9, 2026 the county’s budget and Development Services pages still post only the FY2026 schedule, but asked whether $310 and $335 are still current for the fiscal year that began October 1, the county answered in writing on October 12, 2026: “Yes.” Compare other counties on our permit fee table.

Lot size: two acreage rules, two dates

Collin County’s Order sets a one-acre minimum for lots on public water and 1.5 acres for lots on their own well, and each rule is keyed to a different date. Section 10(a) applies to land “platted or subdivided after the effective date of the original order (Court Order # 83-194-4-4, effective April 4th, 1983)” and requires “a USEABLE surface area of at least one (1) acre.” Section 10(b) covers land on individual water systems divided after “Court Order # 97-812-11-24, effective November 24th, 1997” and requires “at least one and one half (1.5) acres.”

The county’s FAQ words it differently: a lot divided between 1983 and 2008 “must start with a minimum of 1 acre (or 1.5 acres if there is a water well on the property),” and one divided in 2008 or later needs “1 usable acre” (“1.5 acres minimum with 1 acre usable if there is a water well on the property”), meaning “usable for OSSF components/disposal area (excluding most easements, ponds, etc.).” The FAQ tells owners to call if exact dates matter. A lot made smaller after those dates is ineligible, and one that existed at its current size before 1983 may qualify with documents proving it.

On large tracts, Section 10(d) reads: “All OSSF systems in Collin County’s jurisdiction shall be subject to Licensing Requirements regardless of lot size.” The county FAQ requires a permit for property outside city limits and mentions no acreage exception. Asked about that section, Collin County Development Services told us in writing on October 9, 2026: “This is referring to the subdivision platting requirements.” Asked whether a single-family home on a tract of ten acres or more that is not part of a new subdivision still needs a county OSSF permit, the county answered in writing on October 12, 2026: “Yes.” So acreage alone does not exempt a home from Collin County’s permit, whatever the state’s 10-acre rule allows elsewhere.

Only a sanitarian or engineer can evaluate and design

Section 10(c) narrows the state rule: “Either a registered professional sanitarian (with a current site-evaluator’s certification) or registered professional engineer shall perform all site evaluations and complete any OSSF designs, as-builts or system certifications.” The county’s Site Evaluator Information Sheet repeats it. A site evaluator certified by TCEQ but holding neither credential cannot sign here, regardless of what the state would allow.

The county keeps a courtesy list of qualified designers and endorses no one on it; the FAQ says “You may choose any currently licensed Registered Sanitarian or Professional Engineer.” Installers and maintenance providers are verified through TCEQ’s license database.

Two inspections, then a License to Operate

Collin County inspects twice, at installation and at final, and nobody may occupy the building until the system has passed and received a License to Operate. The Inspection Handout says both inspections “CAN BE DONE AT THE SAME TIME.” Tanks and lines must be uncovered: “SEPTIC TANKS AND LINES CANNOT BE COVERED, OR THE INSPECTION WILL FAIL.” Two-piece tanks need water above the seams, and one-piece tanks need to be at least half full. An installation that departs from the design needs a redesign by the sanitarian or engineer.

The Inspection Handout (revised 8/30/11) says “WE WILL RE-INSPECT ONE TIME AT NO CHARGE” and charges $75 for additional inspections; the FY2026 fee schedule lists a $75 re-inspection “After failure of first inspection.” Collin County Development Services told us in writing on October 9, 2026 that “the first failed reinspection is free, after that it is $75.” Order Section 10(f) requires every irrigation spray head to be a subsurface pop-up head. A buyer’s independent inspection is priced in our septic inspection cost guide.

Contracts after approval

Collin County’s Information Sheet treats the maintenance contract as continuous, but the county told us in writing that an owner may maintain an aerobic system after the first contract by following TCEQ rules. The Information Sheet says “Maintenance contracts must be maintained at ALL times.” The first contract is “good for 2 years,” then “the owner is responsible to renew the contract, but not required to use the original installer,” with renewals submitted to the county 30 days before expiry. Providers inspect “3 times a year minimum,” and the Order fixes the spacing at no fewer than 120 and no more than 130 days between inspections (Section 10(e)).

Section 10(g) of the Order reads: “Any/all required OSSF maintenance must be performed by an appropriately licensed OSSF Professional – home/property owner maintenance allowed only if the owner has a minimum of Class D Wastewater License and proof of training by an appropriately licensed OSSF Professional.” An owner doing the work files an annual letter of intent and reports three times a year.

Texas Health and Safety Code §366.0515(a) says a permitting authority “may not condition a permit or the approval of a permit for an on-site sewage disposal system using aerobic treatment for a single-family residence” on “the system’s owner contracting for the maintenance of the system,” and §366.0515(g) says “The owner of a single-family residence shall maintain the system directly or through a maintenance contract.” The county’s recorded affidavit form mentions a “continuous service policy for the first two years” and then says the owner of a single-family aerobic system “shall either obtain a maintenance contract within 30 days or maintain the system personally.” Asked whether an owner may maintain the system after the initial contract, Collin County Development Services told us in writing on October 9, 2026: “As long as they follow TCEQ regulations.” The reply did not address Section 10(g)’s license requirement, and this page does not rule on how the Order and the statute fit together, so confirm with Development Services before canceling a contract. Cost background is in our aerobic maintenance contract guide.

On a sale, the county requires three items for an aerobic system: a Change of Ownership form, the Aerobic Wastewater Homeowner’s Information sheet, and a maintenance contract in the new owner’s name. The Information Sheet sets the form deadline at “within 15 days of the closing date.”

Spray systems dominate: of the 620 systems the county agent authorized in 2025, TCEQ counts 428 surface irrigation and none as standard trench or bed. The aerobic system cost guide and new septic system cost guide price what follows the permit.

Official forms and documents

Collin County hosts everything below unless noted.

The Collin County directory page covers soils and lists licensed professionals working in the county.

Frequently asked questions

How much is a septic permit in Collin County, Texas?

$310 for a non-aerobic system or $335 for an aerobic one; the county confirmed in writing on October 12, 2026 that both are still current. Repairs are $100 or $150, the first re-inspection after a failure is free and each later one is $75 (the county confirmed the aerobic split and the re-inspection rule in writing on October 9, 2026), and the new-construction development permit is a separate $75 line.

Do I need a septic permit on 10 acres in Collin County?

Yes, according to the county. Asked whether a single-family home on ten acres or more that is not part of a new subdivision still needs a county OSSF permit, Collin County Development Services answered “Yes” in writing on October 12, 2026. Its FAQ also requires a permit for property outside city limits, and Order Section 10(d) subjects all systems to licensing requirements “regardless of lot size,” which the county says refers to “subdivision platting requirements.”

How long does a Collin County septic permit take?

The county publishes no review time. TCEQ’s rule is a decision on the planning materials and permit application within 30 days of receipt, and Collin’s permit lapses after 365 days with no activity.

Does Collin County require an aerobic septic system?

No, in the county’s jurisdiction: the county’s Information Sheet says it “does not require Aerobic Systems.” The town of Fairview does, by ordinance, for new systems inside its limits.

Can I maintain my own aerobic system in Collin County?

After the initial contract, yes: Collin County Development Services told us in writing on October 9, 2026 that owners may do so “as long as they follow TCEQ regulations.” Order Section 10(g) also names a Class D wastewater license, proof of training, an annual letter of intent, and three reports a year, so call Development Services before changing a contract.

Sources & Methodology

Fees, forms, and process steps come from Collin County’s own pages and documents, read October 8, 2026. The county’s Court Order is a scanned image; its Section 10 quotations were checked on October 9, 2026 against a 300-dpi text recognition of the county’s copy. The agent list is TCEQ’s OARS registry, re-read October 9, 2026; the Lucas and Fairview pages agree with it. System counts come from TCEQ’s installation report dated April 27, 2026, and statute excerpts from the Texas Legislature’s site. Collin County Development Services answered our written questions on October 9 and October 12, 2026; those answers are attributed where used. Left open rather than guessed: review time and how Order Section 10(g) fits with the state contract statute.

Authorities

Where to apply for a Collin County septic permit.

Collin County Authorized Agent

4690 Community Ave, Ste 200 MCKINNEY , TX, 75071
(972) 548-5585
Official OSSF septic permit information ↗

Before you start

Any new system or major repair needs authorization before construction starts. Emergency repair? Call the agent first — most offices fast-track failing-system fixes rather than letting sewage sit.

Hire a septic company in Collin County.

The license-verified septic companies on our Collin County page are each matched to TCEQ records, with phone numbers and license status.

Find Collin County septic companies
Free septic company quotes

Get free quotes from verified Collin County septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.