Texas septic rules live in one place: Title 30, Chapter 285 of the Texas Administrative Code, enforced by TCEQ or by the county that TCEQ has delegated to. The rule is short on ceremony and specific on substance. You need a permit to build, alter, repair, extend, or operate a system unless you fit a listed exception; the permitting authority has 30 days to approve or deny; and your county may be stricter than the state, which many are.
The five numbers worth knowing. A permit application must be approved or denied within 30 days (§285.3(c)). An authorization to construct is good for one calendar year (§285.3(d)(1)). A new subdivision lot on septic must be at least half an acre with public water or one acre without it (§285.4(a)(1)). Every new aerobic unit starts with a two-year service policy (§285.7(c)). And the ten-acre permit exemption carries four conditions, not three (§285.3(f)(2)).
Almost always. 30 TAC §285.3(a) is the trigger: “A person shall hold a permit and an approved plan to construct, alter, repair, extend, or operate an on-site sewage facility (OSSF) unless the OSSF meets one of the exceptions in subsection (f) of this section.”
Read that list of verbs carefully, because people are usually surprised by two of them. Repair is in it. Operate is in it. Building a new house is the obvious case, but replacing a tank or a drain field is a repair that requires a permit for the entire system, and running a system you inherited is covered too.
The exceptions in §285.3(f) are narrower than folk wisdom suggests:
Two things are simply not allowed, whatever your acreage. §285.3(i) prohibits boreholes, cesspools, and seepage pits outright. And §285.3(g) puts any system treating more than 5,000 gallons a day outside Chapter 285 altogether, into the wastewater permitting chapters.
Half an acre with public water, one acre without, for subdivisions platted after the rule took effect. That is §285.4(a)(1)(A) and (B), and it is the floor rather than the answer: soil type, system type, and county rules routinely push the practical minimum higher.
Two carve-outs matter. Lots subdivided before January 1, 1988, or covered by a site-specific sewage disposal plan approved between 1988 and the rule’s effective date, may still use a septic system even though they miss the minimum (§285.4(b)(1)). They still have to meet every other requirement in the chapter, which on a small lot is the hard part.
The second is a family provision that few people know about, and it is narrower than it first looks. Under §285.4(a)(1)(C), where one tract is divided into four or fewer parts, each five acres or larger, and each is transferred to someone related to the owner within the third degree by consanguinity or affinity, the tract “is exempt from submitting planning materials required in this section.” Read that literally. It excuses the planning materials, not the half-acre and one-acre minimums above it, and not the permit.
You may be able to design your own system, and you almost certainly cannot install someone else’s. These are two different questions, and Texas answers them differently.
On design, §285.5(a)(1) is permissive: “Either the owner or installer may prepare the planning materials for any proposed OSSF not requiring the preparation of plans according to paragraphs (2) or (3) of this subsection.” The owner can plan a standard system on a straightforward site.
Paragraph (2) is where that stops. Planning materials must be sealed, signed, and dated by a professional engineer or professional sanitarian for anything that is not a standard treatment or disposal method under Subchapter D, and for systems serving manufactured housing communities, RV parks, or multi-unit developments where spaces are rented or leased. In the Edwards Aquifer recharge zone, the professional requirement applies regardless. In practice, in the Hill Country counties where nearly every permit is aerobic with surface application, most homeowners land in paragraph (2) whether they planned to or not.
Installation is stricter. Installers are licensed by TCEQ, and so are site evaluators, maintenance providers, and designated representatives. You can check any license yourself through TCEQ’s licensing lookup before you sign anything, which is the single cheapest piece of due diligence available to a septic buyer.
They are in a table, not in the body of the rule, and the table is §285.91(10). §285.30(b)(4) is the pointer: every feature near the proposed system that could contaminate it or be contaminated by it must be identified during the site evaluation, “the separation requirements are in §285.91(10) of this title,” and all of them must be drawn on the site plan.
That table governs distances to wells, property lines, buildings, easements, and surface water. Read it against your own site drawing rather than against a number someone quoted you, because the required separation depends on which component and which feature you are measuring between. Variances exist under §285.3(h), but the rule is deliberately grudging about them: “Variances for separation distances shall not be granted unless the provisions of this chapter cannot be met.”
Chapter 285 puts a deadline on almost every step, and most of them run against the permitting authority rather than against you.
The chapter sets a clock at nearly every step.
One provision saves a lot of anxiety at closing: under §285.3(a)(3), “Permits shall be transferred to a new owner automatically upon sale or other legal transfer of an OSSF.” The state rule asks for no application, though a local permitting authority can still want its own transfer filing: the Angelina & Neches River Authority, for one, says “a Transfer Permit must be obtained” and charges a $35.00 license transfer fee.
There is a matching obligation, and it follows the property rather than the person. For the system types listed in §285.91(12), §285.3(b)(3) puts a notice into the property’s own chain of title before construction is ever authorized. It names the owner, describes the land, and warns any future reader of the deed that a system requiring continuous maintenance sits on it. It also carries the duty in the rule’s own words. At any time after the initial two-year service policy, the owner of an aerobic treatment system for a single-family residence must “either obtain a maintenance contract within 30 days of the transfer or maintain the system personally.” §285.90(2) supplies the model form.
If you have an aerobic unit, you owe either a contract or your own labor, and the choice is yours only if you live there. §285.7(c) puts every new system that requires a maintenance contract under an initial two-year service policy, running from the date the builder sells a new home. §285.91(12) sets which systems those are, not §285.7 itself. After that, §285.7(d)(4) gives the owner of a single-family residence a fork: maintain it personally, or sign a new maintenance contract. §285.7(a) confirms that “homeowners who maintain their own systems are exempt from contract requirements, as provided in subsection (d)(4) of this section.” That trailing clause is doing work: the exemption runs only as far as (d)(4) allows, which means a single-family residence, after the initial two-year policy.
The fork closes for everyone else. §285.7(d)(4)(B): “An owner may not maintain an OSSF under the provisions of this section for commercial, speculative residential, or multifamily property.”
If you hire it out, the person doing the work must be TCEQ-licensed as a maintenance provider or registered as a maintenance technician working under one (§285.7(b)(1)). The contract has a mandatory minimum content list under §285.7(d)(1), down to naming the responsible provider and the response time for a complaint. Our aerobic maintenance contract guide walks through what a compliant contract looks like.
Routine upkeep you do yourself falls into a different category than repair work, and the boundary is drawn in the definitions rather than in the maintenance rule. §285.2(35) and §285.2(61) between them keep ordinary upkeep outside the permit system entirely, which is why cleaning your own effluent filter needs nobody’s permission.
Over the recharge zone, the state adds a second layer of rules on top of everything above. Subchapter E of Chapter 285 exists only for this. §285.40 sets a minimum of one acre per single-family dwelling in the recharge zone, keeps treatment and holding tanks at least 50 feet from a recharge feature, and keeps soil absorption systems at least 150 feet from one. §285.41 sequences the rest: where an Edwards Aquifer protection plan is required for the site, the appropriate TCEQ regional office must approve it before an authorization to construct can be issued.
That last point is a sequencing trap rather than a paperwork detail, and it is worth knowing when it springs. Where a plan is required, the county cannot issue your permit until TCEQ has approved it, and the state approval becomes the long pole. Two thresholds decide whether a plan is required of you at all. On the recharge zone, §213.5(g) sends on-site systems to §285.40 rather than to a Chapter 213 plan, and §213.5(h)(2) exempts an individual land owner building their own single-family residence from the protection-plan application entirely, provided impervious cover stays at 20 percent or less. Over the contributing zone, §213.21(b) reaches only activities disturbing at least five acres, or a smaller lot inside a larger common plan of development or sale — a subdivision, in practice. So the second agency is often the developer’s problem rather than the single buyer’s. Counties over the aquifer sequence their own permits behind the state approval where one is required: Comal County will not issue an authorization to construct over the contributing zone until a TCEQ regional office has approved the plan §213.21 requires, which its permit guide sets out in order.
Because Chapter 285 explicitly lets them be. §285.3(a)(2) makes the executive director the permitting authority “unless a local governmental entity has an OSSF order, ordinance, or resolution approved by the executive director.” Where a county has one, §285.10(a)(1) requires it to run its program according to that order, and §285.10(a)(2) requires it to enforce both the chapter and Texas Health and Safety Code Chapter 366.
The practical consequence is that the state rule is a floor and your county’s adopted order is the ceiling. A local order can require a permit at any acreage, set larger minimum lot sizes, add a floodplain or aquifer review, or require professional design where the state would not. Several Texas counties have done exactly that with the ten-acre exemption. Which office holds the pen in each county is answered in who issues septic permits in every Texas county; what it costs and how long it takes belongs on the individual county permit guides.
A failing system loses the very exemption that was protecting it, because every exemption in §285.3(f) is conditional on not creating a nuisance.
A system “causing a nuisance or not operating in compliance with this chapter” is a malfunctioning OSSF under §285.2(39). That classification is what opens the enforcement door for the authorized agent. The exemptions above are conditional on not creating a nuisance, so a failing system loses its grandfathered status.
The commercial reality usually arrives before the regulator does. An unpermitted or undocumented system becomes a live problem at sale, when there is no permit file to hand a buyer and no notice of approval to point at.
Yes, unless you fit one of the exceptions in 30 TAC §285.3(f). The rule requires a permit to construct, alter, repair, extend, or operate a system. Repair and operation are both on that list, so replacing a tank or drain field needs a permit even though nothing new is being built.
Half an acre if a public water supply serves the lot, one acre if it is not, for subdivisions platted or created after §285.4 took effect. Lots subdivided before January 1, 1988 may still use septic without meeting that minimum, and counties may require more.
You may be able to prepare the planning materials, but installation is a licensed trade. §285.5(a)(1) lets an owner or installer prepare plans for a standard system, while non-standard systems and anything on the Edwards recharge zone require a professional engineer or professional sanitarian. Installers hold TCEQ licenses, and you can verify one before hiring.
The permitting authority has 30 days to approve or deny the application under §285.3(c). That is the statutory clock, not a service promise, and it does not include time to complete a site evaluation and gather planning materials beforehand. Where the site needs an aquifer plan, counties over the Edwards Aquifer must wait for the state approval before making a county decision.
Yes, automatically. §285.3(a)(3) transfers permits to the new owner on sale or other legal transfer. Once the initial two-year service policy has run, a buyer of a property with an aerobic treatment system must obtain a maintenance contract within 30 days of the transfer or maintain the system personally, which the recorded affidavit under §285.3(b)(3) puts them on notice of.
TCEQ has an open rulemaking on Chapter 285, and this page deliberately does not summarize it. A page like this one should tell you what the rules require today. We track what is proposed, what is adopted, and what is in force separately, with its own as-of date, in our Texas septic rule-change tracker.
Every rule statement here was read from rule text and traced from the quoted sentence up to its top-level subsection before it was written down, because a genuine quotation attached to the wrong citation is still a wrong citation.
Currency was checked rather than assumed. Five of these sections were first read from a state-hosted compilation that prints no revision date and turned out to predate the July 6, 2023 amendment, so each was re-read against the current text in two independent sources before this page was finalized. Nothing had moved. The section source notes run: §285.4 and §285.5 amended December 27, 2012; §285.10 amended May 14, 2020; §285.3 and §285.7 amended July 6, 2023.
Two things are deliberately absent. No setback distance appears, because §285.91(10) was not retrieved this pass, and naming where a number lives beats reproducing it from memory. No permit fee appears either, because fees belong to each authorized agent and to the county guides that date them.
This page explains the state rules. It is not legal advice, and your county’s adopted order may require more than the state does.
Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.
Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.