Permit guide

Bandera County Septic Permit (2026): Fees & Inspections

Verified against county records · page updated October 17, 2026 · rules change — confirm with the agent before applying

A septic permit in unincorporated Bandera County costs $210 for a standard residential system under 500 gallons a day and $400 if the design is aerobic or exceeds that flow, and the county will not take the application until the County Engineer has signed off on a development permit ($50 for a residence). The county inspects twice, issues the authorization to construct only after the first visit, and permits every system regardless of acreage, so owning 10 acres or more exempts nothing.

Step one is a development permit, not a septic permit

The first line on the county’s septic checklist is “Development Permit # ______ (with County Engineer’s Signature),” so the septic paperwork starts at a different form. The residential development permit application costs $50 under the county’s fee schedule (footer “Revised 02/2024”); a commercial one costs $400. The current form, revised January 8, 2025, asks whether the property will use a septic system or public sewer and flags flood risk early: a site in a mapped flood hazard area needs plans submitted with it, and one in a floodway needs a “no-rise” letter signed and sealed by a professional engineer.

Flood rules carry into the septic design. The county’s Flood Damage Prevention Court Order, adopted April 9, 2020, requires a floodplain development permit outside city limits and says septic systems “shall be located to avoid impairment to them or contamination from them during flooding.” The septic checklist asks for a 100-year floodplain map as well.

What the permit costs

Bandera County prices its septic permit by system type and flow, with no surcharge for the floodplain. Every figure below is from the county’s Regulatory and Permitting Fees sheet.

Permit or feeAmount
Residential development permit application$50
Commercial development permit application$400
Residential septic permit, non-aerobic, under 500 gal/day$210
Residential septic permit, aerobic or 500 gal/day and over$400
Commercial septic permit$400
Modification permit$210
Re-inspection$45

The $45 re-inspection fee also applies when an installer cancels an inspection with less than two hours’ notice, according to the application. Fees are payable to Bandera County; the County Engineer’s page links an online payment portal. To compare these numbers with other counties, see the Texas septic permit fee table; for what the system itself costs, see the new septic system cost guide.

What goes in the application

A complete packet is required before the first inspection, and the county’s checklist names eleven items. From the residential application (effective July 6, 2022):

  1. The development permit number with the County Engineer’s signature
  2. A site evaluation by a licensed site evaluator
  3. The system design criteria
  4. A scaled drawing of the system
  5. A recorded affidavit joining two lots, or N/A
  6. A 100-year floodplain map
  7. All electrical equipment shown
  8. A topographic map
  9. Every water well located
  10. All easements shown
  11. An overall site plan

An aerobic system adds three: a design “Prepared by a PE or RS,” a maintenance contract, and a recorded Affidavit to the Public for aerobic subsurface and surface application. The form states that “all planning materials must be submitted with this application prior to the first inspection and authorization to construct.” Under state rule, the county then has 30 days to approve or deny the planning materials.

Two inspections, and nothing in the ground before the first

The county authorizes construction only after its first site inspection, and approves the finished system at a second one before it is covered. The application is explicit that “in NO instance should any component of the OSSF be placed in the ground before receiving the Authorization to Construct.” After the second inspection passes, the notice of approval goes to the owner by mail, which is why the form asks for the mailing address you will have when the job is done.

Three timing rules apply to whoever schedules the work:

  • Notice. The 2007 Order asks for notice “at least 5 working days prior to the need for inspection.”
  • The installer must be there. The licensed installer has to attend every inspection; arriving more than 30 minutes late means a re-inspection trip at the installer’s expense.
  • One year. The application “Expires ONE (1) year from date of application fee being paid or the issuance of the Authorization to Construct.”

The Permits and Inspections office keeps short Fridays: Monday through Thursday 7 a.m. to 4:30 p.m., closed for lunch from noon to 12:45, and closing at noon on Friday.

Local rules that go past the state minimum

Bandera County’s Order adds two local provisions to the state’s Chapter 285, and its subdivision rules add lot sizes on top. The Order, passed June 14, 2007 and approved by TCEQ on August 27, 2010, is short; these are the parts that change a project:

  • No 10-acre exemption. Section 10(a): all systems in the county “are required to be licensed by the Licensing Authority regardless of lot size or acreage.” The state exemption for 10-acre tracts does not help a ranch house here.
  • Re-inspection at sale, on request. Section 10(b) lets a seller apply to the county for a re-inspection. It is optional, but it gives a buyer a county record of the system’s condition.
  • Complaints and appeals. The county investigates nuisance complaints “within 21 days of receipt,” and anyone aggrieved by a decision can appeal to Commissioners Court.

New subdivisions carry minimum lot sizes in the county’s Subdivision and Land Development Regulations: ten acres for a lot with its own well and septic system, five acres for a lot on public water with septic. Those apply to platting new lots, not to an existing tract.

Aerobic systems and the maintenance contract

If the design is aerobic, the county requires a maintenance contract and a recorded affidavit before construction is authorized. The application states that “a Maintenance Contract will be required for an aerobic OSSF.” The county’s Order adds no local rule beyond the state’s on who maintains the system after the initial contract, so the state’s rules on renewal and owner maintenance apply; our aerobic maintenance contract guide covers them, and the aerobic system cost guide covers the running cost.

TCEQ’s 2025 report shows how the county’s approvals split: of 263 systems, 143 used leaching chambers, 95 surface irrigation, 15 standard trenches or beds, and 10 drip.

Who permits where

Outside the City of Bandera, the county’s Permits and Inspections Department issues septic permits. Inside city limits, start with the City of Bandera: the county’s permit office told us on October 7, 2026 that “the city is totally different than the county.” The county Order, in the copy TCEQ approved in 2010, excludes “the areas within the incorporated City of Bandera,” and the city has had its own septic ordinance since April 13, 2000, naming the city administrator as designated representative. TCEQ’s register of authorized agents, read October 7, 2026, lists the county’s area as the “entire County” and names no city agent. Ask the county Permits and Inspections Department and the city which office permits your lot before you apply. The city ordinance requires every new or replacement system to be designed by a professional engineer or registered sanitarian qualified as a soil evaluator, and requires “a new license … each time ownership of said facility changes.” TCEQ’s list of who permits where is on our permit authority page.

Bandera County is not one of the eight counties under TCEQ’s Edwards Aquifer septic rules, so those added lot-size and setback rules do not apply here.

Bandera County Permits and Inspections Department (TCEQ Authorized Agent 620009)
County Engineer: Dieter Werner · OSSF Designated Representative: Trent Smith
1212 Hackberry Street, Second Floor, P.O. Box 3275, Bandera, TX 78003
Office (830) 796-3175 · Metro (830) 460-8183
Monday to Thursday 7:00 a.m. to 4:30 p.m.; closes at noon Friday

Official forms and documents

All of these are linked from the County Engineer’s page; download the current copy before you file.

The Bandera County directory page lists licensed septic professionals who work in the county.

Frequently asked questions

How much is a septic permit in Bandera County, Texas?

$210 for a residential standard system under 500 gallons a day, $400 for a residential aerobic system or one above that flow, and $400 for any commercial system. A residential development permit, required first, adds $50. A modification permit is $210 and each re-inspection $45.

Do I need a septic permit on 10 acres or more in Bandera County?

Yes. Section 10(a) of the county’s Order requires every system to be licensed “regardless of lot size or acreage.” The state’s 10-acre exemption does not apply in the county’s jurisdiction.

How long does a Bandera County septic permit last?

One year. The application expires one year from the date the fee is paid or the authorization to construct is issued.

Can I install my own septic system in Bandera County?

The county’s documents do not offer a homeowner-installer path; the application assumes a licensed installer, who must attend every inspection. TCEQ’s rule is that owner installation “depends on whether the permitting authority allows this,” so ask the Permits and Inspections Department before planning on it.

Who issues septic permits inside the City of Bandera?

Not the county, by its own account: its permit office told us on October 7, 2026 that “if it’s in the county, the county issues the permits” and that “the city is totally different than the county.” Start with the City of Bandera. The county’s Order excludes the incorporated city and the city has its own septic ordinance, but TCEQ’s register lists the county agent for the “entire County” and names no city agent. The city’s ordinance requires an engineer or registered sanitarian to design every new or replacement system and a new license whenever the property changes hands.

Sources & Methodology

Fees, forms, process steps, office hours and local rules were read on October 5, 2026 from Bandera County’s own documents: the Regulatory and Permitting Fees sheet, the residential and commercial permit applications, the development permit application, the 2007 OSSF Order, the 2020 Flood Damage Prevention Court Order, the Subdivision and Land Development Regulations and the County Engineer’s web page. The residential application and the flood order are scans; quotations come from OCR text, and the application’s were also checked against its page images. City rules come from the City of Bandera’s code, Article 13.08. State rules are from TCEQ’s Getting a Permit page (August 2026), 30 TAC §285.40 and Chapter 213. The 263-system split comes from TCEQ’s report of systems installed in 2025, dated April 27, 2026. TCEQ’s register of authorized agents and the TCEQ approval of the county Order on file there were read on October 7, 2026. The county’s answer on city lots comes from a phone call to its Permits and Inspections office on October 7, 2026. Whether the county allows owner installation is still flagged rather than answered.

Authorities

Where to apply for a Bandera County septic permit.

Bandera County Authorized Agent

1212 Hackberry St, 2nd Fl BANDERA, TX, 78003
(830) 796-3175
Official OSSF septic permit information ↗

Before you start

Any new system or major repair needs authorization before construction starts. Emergency repair? Call the agent first — most offices fast-track failing-system fixes rather than letting sewage sit.

Hire a septic company in Bandera County.

The license-verified septic companies on our Bandera County page are each matched to TCEQ records, with phone numbers and license status.

Find Bandera County septic companies
Free septic company quotes

Get free quotes from verified Bandera County septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.