Skip to content
Nearby Septic — nearbyseptic.com · Verified septic directory · printed Nov 25, 2026
Permit guide

Bastrop County Septic Permits (2026): Fees & Forms

Verified against county records · sources last read August 17, 2026 · rules change — confirm with the agent before applying

A septic permit in Bastrop County costs $600 for a standard residential system and $700 for an aerobic or other professionally designed one, on a fee schedule adopted June 20, 2025. Add the $10 state fee, collected on top rather than folded in, and the $225 single-family development permit filed alongside it. There is no ten-acre exemption here, and no extensions: an on-site sewage facility (OSSF) permit that runs out its year cannot be renewed.

Who Takes Your Application?

Two TCEQ authorized agents operate in Bastrop County, and one handled 969 of last year’s 970 authorizations.

Bastrop County Development Services, agent no. 620010, runs the OSSF program from its Environmental & Sanitation division at 211 Jackson Street in Bastrop, 512-581-7176, Monday through Friday 8:00 a.m. to 4:00 p.m. The county names seven staff with direct dials, two design reviewers and three inspectors among them: design and inspection questions go to different desks.

The City of Bastrop, agent no. 620249, permits inside its own limits from the Planning Department at 1311 Chestnut Street, 512-322-8840. Its delegation is nearly dormant, one authorization in 2025 and three in 2024, but inside the city it is your office, and the process differs: applications through MyGov, and “Applications are only accepted for review on Mondays by 4pm.”

Elgin and Smithville hold no OSSF ordinance, so the county permits inside those city limits too, under Order §6, which applies the county rules everywhere “except for areas regulated under an existing Order, Ordinance or Resolution.” The LCRA does not permit here either: its delegation covers Burnet, Lampasas, Llano, San Saba and Travis, with no Bastrop row in TCEQ’s reporting for 2023, 2024 or 2025. Nor does TCEQ’s Austin regional office, which authorized 17 systems region-wide in all of 2025. Our permitting authority directory maps the state; the Travis County guide covers the neighbor where LCRA does operate.

What Will It Cost?

Read the septic fee and the development fee together: Bastrop makes you file them at the same time.

Line, as the county publishes itAmount
OSSF Standard Residential$600
OSSF Non-Standard designed by PE or Designer, Residential or Aerobic Residential$700
OSSF Standard Commercial$1,000
OSSF Non-Standard Commercial or Aerobic Commercial$1,200
Design Resubmission$250 per resubmission
System modification, Residential / Commercial$300 / $500
Re-inspection$200 per inspection
Maintenance contract late fee$100
OSSF renewal$20
Development permit, Single Family$225
Development permit, Single Family with Floodplain$300
9-1-1 addressNo charge
Statutory state fee, added to every permit$10

Summed, a new standard system on a single-family lot outside the floodplain comes to $835, or $910 inside mapped floodplain; aerobic makes it $935 and $1,010. That is our arithmetic on the county’s own lines, not a total Bastrop quotes: the components are the authority, the total a planning number. The statewide fee index shows how that compares.

Order §12 supplies the $10 and puts it on top: “A fee of $10.00 will also be collected for each on-site sewage facility permit to be paid to the credit of the TCEQ Water Resources Management Account as required by the THSC, Chapter 367.” The fee schedule never mentions it.

One warning before you download anything. The county’s own OSSF application PDF ships an obsolete fee page as page 3. Its septic figures match, so the numbers above hold either way, but its development-permit figures do not: $450 per RV slip where the adopted schedule says $50. Use only the standalone schedule stamped “Adopted 06/20/2025.”

The Rules That Catch People Out

Three local rules will change your plans, and none is the acreage rule everyone asks about.

The acreage question has a short answer, from the county’s own OSSF page: “All septic installation/modifications require a permit, regardless of acreage.” Order §10.1 says the same at greater length. There is no ten-acre exemption in Bastrop County.

Your permit cannot be extended. Every other development permit here gets three years plus a one-time 180-day extension on request. The OSSF permit gets one year, from the date the Authorization to Construct (ATC) issues, or from the initial site confirmation inspection if no ATC has issued, and the policy runs one sentence: “Extensions will not be granted for OSSF permits.” A year is generous if your installer is free and brutal if your build stalls.

Whether you need a stamped design turns on the lot, not the system. Order §10.5 requires planning materials stamped by a Professional Engineer or Registered Sanitarian “regardless of system type” in six situations, two of them pure geometry: any lot of half an acre or less, and any second residence on a tract under two acres.

A restaurant on spray disposal enters a different regime. Order §10.5(f) puts any food-service structure using surface application on monthly testing and reporting for its first year, then quarterly if it logs fewer than two failures. It also requires flow equalization, a licensed maintenance provider under contract, and two on-site logs: every chlorine addition and residual, and an annual grease-trap pump-out.

Three smaller rules. Licensed installers must give a day’s notice before an inspection; homeowner installers may get same-day service case by case (§10.6). Five subsurface system types need inspection ports at the end of each trench or the back corner of each bed (§10.3). Sewage found above ground means pump immediately, fifteen days from the violation notice to start repairs, fines up to $500 a day (§10.4).

How the Application Actually Moves

Online through MyGovernmentOnline, and filed alongside the development permit, not after it.

Bastrop moved to MGO Connect on January 7, 2021, though the application PDF still prints the paper path: 211 Jackson Street, check or money order. The sequencing rule matters: “When a public wastewater system is not available, applications for a Development Permit and an OSSF (Septic) Permit are to be submitted concurrently.”

The application’s OSSF column asks for eight things: the fee, the completed application, proof of ownership, a survey or plat, the septic plan and specifications, a release of easement where one applies, the soil evaluation report, and the maintenance contract where required. Floor plans go in too, and a bedroom addition triggers a septic review before the development permit will issue.

Emergency repairs (tank lids, inlet and outlet devices, solid-line repairs) need no permit but must be reported to the county, not TCEQ, within 72 hours of starting. Lodging and RV developments stay with the county only if estimated flow is at or below 5,000 gallons per day; above that, Chapter 26 of the Texas Water Code applies.

What the county does not publish is a turnaround time. Not on the OSSF page, not in the policies, the application, the fee schedule or the Order; we checked all of them on August 17, 2026. Any number of weeks quoted for Bastrop County was invented by whoever wrote it.

The Disaster Provision, Quoted Exactly

Bastrop County publishes one disaster-linked permitting provision, and it is narrower than the county’s fire history suggests.

The whole of it, from the Development Services policy list: “Fees for permits necessitated by a declared federal emergency will be waived for those residents rebuilding on the same property.”

Four qualifiers matter. It is a fee waiver, not an expedited review. It is triggered by a declared federal emergency, not by wildfire as such. It reaches only residents rebuilding on the same property.

The fourth: it is a department policy on a web page, not a clause in the OSSF Order or the fee schedule, and it never uses the word OSSF, though OSSF permits are Development Services permits and the policy governs the department.

Beyond that sentence there is nothing: no wildfire-specific septic rule, waiver, variance or rebuild track in the Order, the OSSF page, the application or the fee schedule. The county’s 474-page 2022 Hazard Mitigation Plan does not contain the word septic.

What Gets Permitted Here

Pressure-dosed and spray systems, overwhelmingly, and the mix is shifting.

Bastrop County authorized 969 systems in 2025 against the City of Bastrop’s one. The county’s split: 453 surface irrigation, 167 low pressure dosing, 143 drip irrigation, 89 leaching chamber. Standard trench-and-bed is down to 29, three percent of the work, and low pressure dosing more than doubled year over year, 77 to 167.

The soil explains the pattern, though not the way the Lost Pines reputation suggests. The dominant NRCS limitation here is slow percolation through dense clay subsoils, firing at full weight on 334,219 acres. Shallow bedrock, the constraint that governs Hill Country counties an hour west, fires on 12,543 acres, barely two percent. Bastrop is a clay county with sand on top, and 763 of its 969 authorizations, 78.7 percent, went to pressure-dosed or spray systems that do not rely on gravity percolation into a clay B horizon.

Volume is falling as the county grows: 1,160 authorizations in 2023, 1,033 in 2024, 969 in 2025, a 16.5 percent decline against 22.3 percent population growth off the 2020 base. Those are permits issued per year, not installed stock, which the county does not publish. Against 2,269 building permits countywide in 2025, septic is roughly 43 percent of new construction; the rest is on public sewer inside the cities.

Our new system cost guide covers the install; the aerobic maintenance contract guide and septic inspection costs cover what a spray system costs to keep running.

Forms and Contacts

All of the below is the county’s own paperwork.

  • Fee schedule, adopted 06/20/2025, the only figures to rely on: bastropcounty.gov/upload/shared/DevServices/2025.06.20 Fee Schedule.pdf
  • OSSF permit application, form rev. June 20 2024: bastropcounty.gov/upload/shared/DevServices/BASTROP COUNTY ON-SITE SEWAGE FACILITY.pdf
  • OSSF Order, TCEQ-certified 12/01/2017: bastropcounty.gov/upload/page/0148/docs/TCEQAppdOSSFOrder.pdf
  • Flood Damage Prevention Order, revised 07/14/2025: linked from the county’s floodplain page
  • Permit portal, MGO Connect: mgoconnect.org
  • Bastrop County Development Services, Environmental & Sanitation: 211 Jackson Street, Bastrop, TX 78602; 512-581-7176; fax 512-581-7178; development.services@co.bastrop.tx.us; Monday through Friday, 8:00 a.m. to 4:00 p.m.
  • Inside Bastrop city limits: City of Bastrop Planning, 1311 Chestnut Street, 512-322-8840, applications at web.mygov.us
  • Pre-development meeting: no form exists; email the staff list published in the county’s 02/11/2026 guide

One caution on finding a professional. The county publishes no installer list and points to TCEQ’s search with ZIP 78602 hard-coded into the instruction, which quietly excludes Elgin, Smithville, Cedar Creek and Red Rock. Widen the ZIP, or start from the providers on our Bastrop County directory page.

Frequently Asked Questions

How much is a septic permit in Bastrop County?

$600 for a standard residential system and $700 for an aerobic or professionally designed one, plus a $10 state fee and a $225 single-family development permit filed at the same time. That is about $835 standard or $935 aerobic outside the floodplain, on the schedule the county adopted June 20, 2025. Re-inspection is $200, a design resubmission $250.

Do I need a septic permit on 10 acres in Bastrop County?

Yes. The county’s own OSSF page states that all septic installation and modification requires a permit regardless of acreage, and Order §10.1 carries the same rule. The state’s ten-acre exemption does not operate anywhere in Bastrop County, including inside Elgin and Smithville, where the county is the permitting authority.

How long does a Bastrop County septic permit take?

The county publishes no turnaround time at all, and we checked every county document on August 17, 2026. Any figure quoted for Bastrop County did not come from the county. Bastrop does publish the deadline on the other end: the permit expires one year after the Authorization to Construct issues, and extensions are not granted.

Can I install my own septic system in Bastrop County?

Yes, for a single-family residence you will live in, and the county says so in its own FAQ. The design and soil evaluation still come from the right professionals, and Order §10.5 requires an engineer’s or sanitarian’s stamp whenever the lot is half an acre or less.

Does the City of Bastrop handle its own septic permits?

Yes, inside its limits, through the Planning Department at 1311 Chestnut Street, 512-322-8840. Its process runs through MyGov, its review queue opens weekly on Mondays at 4 p.m., and it asks for documents the county does not: a technical information form and a plot plan showing impervious cover. It is small in volume: one authorization in 2025.

Who maintains an aerobic system in Bastrop County?

A licensed maintenance provider for the first two years from final approval, after which you may take it over only by showing the county one of three credentials. Order §10.2(e) accepts a TCEQ Maintenance Provider license, a Class D or higher wastewater treatment license, or a passed TOWA Basic Maintenance Course. Testing and reporting duties continue either way.

Sources & Methodology

Every fee, rule, deadline and phone number here comes from a Bastrop County document read on August 17, 2026; the fee schedule and department contacts were re-fetched live that day and matched an earlier reading.

The OSSF Order is a 12-page image-only scan. We OCR’d it at 300 dpi and re-ran §10.2 at 400 dpi to confirm a gap in the lettering: the subsection runs a, b, d, e, with no §10.2(c). Permit counts are parsed from TCEQ’s annual authorized-agent reports rather than retyped; the twelve system-type columns sum exactly to the 2025 and 2024 authorization totals, confirming one type per authorization rather than overlapping tallies.

Where the county publishes nothing, this page says so: no review turnaround, no count of installed systems, no site-evaluation or transfer fee, no City of Bastrop fee amount. Two conflicts inside the county’s own materials are flagged rather than resolved, an obsolete fee page in the OSSF application and a 2026 subdivision revision with a blank adoption date. Only dated, adopted documents are cited.

Authorities

Where to apply for a Bastrop County septic permit.

Bastrop County Authorized Agent

211 Jackson Street BASTROP, TX, 78602
(512) 581-4042
Official OSSF septic permit information ↗

Before you start

Any new system or major repair needs authorization before construction starts. Emergency repair? Call the agent first — most offices fast-track failing-system fixes rather than letting sewage sit.

Hire a septic company in Bastrop County.

The license-verified septic companies on our Bastrop County page are each matched to TCEQ records, with phone numbers and license status.

Find Bastrop County septic companies
Free septic company quotes

Get free quotes from verified Bastrop County septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.