Skip to content
Nearby Septic — nearbyseptic.com · Verified septic directory · printed Nov 24, 2026
Permit guide

Burnet County Septic Permits (2026): Fees & LCRA

Verified against county records · sources last read August 10, 2026 · rules change — confirm with the agent before applying

A septic permit in Burnet County costs $250 for most systems and $400 for aerobic systems, and you cannot apply for it until you hold a 911 address and a building permit ($25 in most of the county, $400 in a mapped flood zone). If your land sits within 2,200 feet of a Highland Lake or 2,000 feet of Lake Travis, you will not file with the county at all: the Lower Colorado River Authority permits those parcels under its own fee schedule, $260 for conventional and $410 for professionally designed systems, each footnoted that $10 is added for a state fee. Acreage does not matter; Burnet County requires a permit on every tract.

Which Desk Takes Your Application?

Your address decides which office owns your file, and TCEQ’s agent registry carries eight entries for Burnet County. Burnet County Development Services (agent no. 620032) takes most unincorporated land, plus the parts of Bertram and Horseshoe Bay that fall outside LCRA’s zone, from Room 107 of the Annex on the Square, 133 E. Jackson Street in Burnet, phone 512-715-5260. The LCRA (agent no. 620185) has held delegation around the Highland Lakes since September 1971, in a band 2,200 feet from the upper lakes (Buchanan, Inks, LBJ, Marble Falls) and 2,000 feet from Lake Travis, and its registry entry also names Granite Shoals and Horseshoe Bay. Three cities are registered for their own city limits: Burnet (620348), Marble Falls (620368) and Cottonwood Shores (620033). Three more hold agent numbers that another office works, according to the registry’s notes: Bertram (620233) by the county, Granite Shoals (620363) by LCRA, and Horseshoe Bay (620396) by “Counties and LCRA.”

Volume tells the same story from the other end. For calendar 2025, TCEQ’s annual report puts the county at 281 authorizations and LCRA at 77, while Granite Shoals’ agent number carried 70, Marble Falls 9 and the City of Burnet 4, out of 441 in all. Bertram’s line shows none, and the report prints no Burnet County line for Cottonwood Shores or Horseshoe Bay.

Do not guess the boundary. LCRA publishes an address lookup at waterquality.lcra.org/ossf, the same map the county’s OSSF page links, and it settles the question in one search. Lakeside jurisdiction changes more than the mailing address: LCRA runs a different portal, different documents and different inspection habits, covered below. For who permits septic in every Texas county, our permitting-authority directory has the statewide list.

How Much Will You Pay, County vs. LCRA?

The two schedules land close together for a standard house but diverge on process fees.

ItemBurnet CountyLCRA
Conventional residential system$250$260 (see LCRA note on the $10)
Aerobic / professionally designed$400$410 (see LCRA note on the $10)
Prerequisite building permit$25 Class A, $400 Class B (flood zone)n/a (floodplain letter required instead)
Reinspectionnot published$150 single-family
Extra site tripnot published$70
Permit revisionnot published$50
Permit renewalnot published$50

LCRA marks its $260 and $410 with a footnote: “$10 is added to the fee to satisfy a required payment to the Texas Commission on Environmental Quality.” The schedule does not say whether that $10 is already inside the listed figure, so ask LCRA when you apply.

County fees are non-refundable application fees, cards accepted with a transaction fee, and the county publishes them as page text with no revision date, so confirm the numbers at the desk before you write a bid around them. LCRA commits to more detail in writing, down to $15-per-lot subdivision field inspections, and notes it sometimes refunds a prorated amount on abandoned applications. Statewide context for these numbers lives in our Texas permit fee index.

The County Sequence: Address, Building Permit, Septic Permit

Burnet County enforces a strict order of operations, and skipping a step gets the packet rejected rather than parked. First, a 911 address for any new residence or business. Second, the building permit: one page, $25 for Class A outside any flood hazard area with no structural inspections, $400 for Class B inside a designated flood boundary with an elevation certificate or engineer’s letter attached (call 512-756-5445 to check which you are). Third, the Septic/OSSF application, which in most cases your licensed installer submits: the site evaluation by a licensed site evaluator, the system drawing or design, and any affidavits or maintenance contracts the system type requires. The application form is blunt in all caps that the soil test comes before the permit and construction before issuance is prohibited. Mail everything to 220 S Pierce Street, Burnet, TX 78611, or email it in and the office calls for payment. The county’s own warning deserves repeating verbatim: “Incomplete permit application packets will not be accepted or processed.”

Expect the site evaluation to drive the design harder here than in most of Texas. Bedrock, not groundwater, is the county’s binding constraint (the NRCS rates 80.2 percent of mapped acreage “Very limited” for absorption fields, almost entirely on shallow-to-rock subrules), which is why the county’s own 2025 authorizations included 123 surface-irrigation and 68 leaching-chamber systems against 56 standard trench-and-bed. Budget accordingly: an aerobic system’s install cost is a different number than a conventional bed, and our new-system cost guide breaks down both.

The LCRA Track Is a Different Animal

Lakeside applicants file online through MyGovernmentOnline and carry a longer document list. LCRA’s published five steps require proof of ownership, a scaled drawing or survey, soil analysis, floor plans, design plans, a floodplain compliance letter, and, for lots under one acre, a recorded plat with its notes. Before the first inspection you mark the layout on the ground, leave the soil profile holes open and clean, and post a roadside notice with the owner’s name and property description. Inspections run staged from site check through Authorization to Construct to the final Permit to Operate. None of that appears in the county’s three published steps, so a builder moving from a Bertram tract to a lot on Lake LBJ should not assume the paperwork travels.

No Ten-Acre Exemption, by Written Order

Large acreage does not skip permitting in Burnet County. The county’s OSSF Order, Section 10(A), says it in one sentence: “Burnet County will permit and inspect all on-site systems regardless of the size of the tract of land the on-site system is situated upon,” citing “the rapid development of property occurring in the county and the abundance of streams, creeks and ponds.” The state’s default exemption for a lone dwelling on ten-plus acres, explained in our Texas 10-acre rule guide, simply does not operate here. The same order section sets two local rules worth knowing before design: surface-application systems may not overlap spray areas unless an engineered design and an inspection confirm the daily application rate is 0.064 gallons per square foot per day or less, and RV-park systems are designed at 100 gallons per space per day because the county found RVs housing full-time residents.

What the County Does Not Publish

Two numbers are missing from Burnet County’s public materials, and pretending otherwise would be guessing. There is no stated plan-review or turnaround time for an OSSF permit, and the posted OSSF Order carries no visible adoption date. What the record does show: authorizations falling while population climbs, 836 county-wide in 2022, 608 in 2023, 497 in 2024 and 441 in 2025, against 16.1 percent population growth since 2020. A call to 512-715-5260 is the only way to get a current review estimate, and providers who work the county weekly are the best read on real-world timing; our Burnet County directory page lists them.

Official Forms and Contacts

Everything below is the county’s and LCRA’s own paperwork and phone tree; nothing is paraphrased.

  • Septic/OSSF Application (PDF): burnetcountytexas.org/DocumentCenter/View/1152
  • Building Application (PDF): linked from the county’s OSSF & Development Permits page
  • On-Site Sewage Facility Order (PDF): burnetcountytexas.org/DocumentCenter/View/1151
  • Burnet County Development Services: 133 E. Jackson St., Room 107, Burnet; mail 220 S Pierce St., Burnet, TX 78611; 512-715-5260; Mon-Fri 8 to 5
  • Flood-zone verification: 512-756-5445
  • LCRA OSSF program: 512-578-3216, inspection scheduling 512-578-4091, jurisdiction map at waterquality.lcra.org/ossf
  • Inside the city limits of Burnet, Marble Falls or Cottonwood Shores: each city holds its own TCEQ registration, so start at that city hall for forms and fees
  • Bertram: the city’s program runs through Burnet County Development Services (numbers above)
  • Granite Shoals: LCRA runs the city’s program; use the LCRA contacts above
  • Horseshoe Bay: LCRA inside its lake zone, Burnet County outside it; check the address on LCRA’s map first

Frequently Asked Questions

How much is a septic permit in Burnet County?

$250 for most systems and $400 for an aerobic system, plus the prerequisite building permit at $25 (or $400 in a flood zone), all non-refundable. LCRA-side parcels pay $260 or $410; LCRA footnotes each figure that “$10 is added to the fee to satisfy a required payment to the Texas Commission on Environmental Quality,” without saying whether that $10 is already in the figure, so ask LCRA when you apply. The county publishes no separate reinspection fee; LCRA charges $150.

Do I need a septic permit on 10 acres in Burnet County?

Yes. The county’s OSSF Order requires a permit and inspection on every tract regardless of size, so the state’s 10-acre exemption does not apply anywhere in the county, on either the county’s or LCRA’s side of the line.

Can I install my own septic system in Burnet County?

State law’s licensing requirement attaches to people doing septic work for compensation, and the county’s published steps assume a licensed installer will usually file for you. Nothing on the county’s OSSF page prohibits an owner-build outright, but the site evaluation must come from a licensed site evaluator, the design must fit it, and every inspection still applies. Call 512-715-5260 before pricing your own labor into the project.

Who handles septic permits near Lake LBJ or Lake Buchanan?

LCRA, not the county, within 2,200 feet of the upper Highland Lakes and 2,000 feet of Lake Travis. Check any specific address at waterquality.lcra.org/ossf; if it falls inside the band, apply through MyGovernmentOnline under LCRA’s document list and fee schedule.

How long does a Burnet County septic permit take?

The county publishes no review timeline, so treat any number you hear as an estimate. The published sequence itself sets the floor: 911 address, then building permit, then a complete OSSF packet, and incomplete packets are returned rather than processed. Ask the office for its current backlog when you file.

Sources & Methodology

Every fee, phone number, sequence step and quotation on this page comes from Burnet County’s own published pages and documents, LCRA’s program pages, TCEQ’s authorized-agent registry and annual reporting, NRCS soil data, and the U.S. Census Bureau, each cited with access dates in the front matter. The county’s $250/$400 fees were last re-checked on its live page on October 11, 2026, when the agent list and 2025 authorization counts were also refreshed from TCEQ. Where the county publishes nothing (review times, order date, city fee schedules) this page says NOT FOUND rather than estimating, and the open items are listed as verification flags for the next update.

Authorities

Where to apply for a Burnet County septic permit.

Burnet County Authorized Agent

133 E Jackson St, Rm 107 BURNET , TX, 78611
(512) 756-5437
Official OSSF septic permit information ↗

Before you start

Any new system or major repair needs authorization before construction starts. Emergency repair? Call the agent first — most offices fast-track failing-system fixes rather than letting sewage sit.

Hire a septic company in Burnet County.

The license-verified septic companies on our Burnet County page are each matched to TCEQ records, with phone numbers and license status.

Find Burnet County septic companies
Free septic company quotes

Get free quotes from verified Burnet County septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.