Hunt County Septic Permits (2026): $335, $300 Near Tawakoni

Verified against county records · page updated November 11, 2026 · rules change — confirm with the agent before applying

Hunt County’s fee sheet, dated June 1, 2022, puts a residential septic permit at $335, and the county’s 2022 Order requires a permit “regardless of lot size,” though its 2020 subdivision regulations say a system for one home on ten acres or more “may be completely or partially exempt.” Within 2,000 feet of Lake Tawakoni the Sabine River Authority issues the permit instead, at $300 for a residence. The county decides within 30 days of a complete application.

Hunt County septic permits by the numbers:

  • 593 systems authorized by Hunt County in 2025, 574 of them surface spray (TCEQ authorized-agent report, run April 27, 2026)
  • 0 standard trench systems authorized by the county in 2024 or 2025 (same reports)
  • 55 authorized by the Sabine River Authority in Hunt County in 2025, 18 of them drip (same report)
  • 4 septic authorities in TCEQ’s register for Hunt County (OARS, read November 9, 2026)
  • 1 acre minimum lot (Order Section 9H.1)
FeeAmountSource
Residential septic permit$335Hunt County fee sheet, “as of June 1, 2022”
Commercial septic permit$500Same
Septic modification$75Same
Re-inspection$75Same
Septic certification (not defined on the sheet)$150Same
Aerobic annual registration$25Same
Development permit$40Same; also on the November 2025 form
State fee per permit$10Order Section 10; the sheet does not say whether $335 includes it
Sabine River Authority residential license (Lake Tawakoni zone)$300SRA application packet, September 2024
Sabine River Authority commercial license$550Same

What other Texas counties charge is in our septic permit fee guide.

Hunt County’s one-acre rule, the no-build zone and the ten-acre split

Under the 2022 Order, a lot on septic needs at least one acre and holds one house per acre, and a half acre suited to a drain field must be marked on any new subdivision survey. Commissioners adopted it December 13, 2022; TCEQ approved it January 12, 2023. Under one acre, the county may approve a system only on a lot of record posing no threat to a water supply or public health (Section 9H.2).

The county’s No-Build Affidavit sets its own trigger: a lot with less than one and a half acres per living unit must record a survey designating a half-acre “On-Site Sewage Facility No-Build Zone” for each unit. The Order’s application rule (9D.2d) asks for a survey by a state-licensed surveyor with the septic area labeled “NO BUILD ZONE – SEPTIC EASEMENT.”

On ten acres, the county’s own texts split:

  • The Order says no exemption. Section 9B.3: “Hunt County does not allow the exceptions provided for under TAC Title 30, Chapter 285, Subchapter A, Rule 285.3(f)(2).” That rule is the state’s ten-acre exemption.
  • The 2020 subdivision regulations list it. Under Section 10.05.B, a system for a single-family home “on a property ten (10) acres or larger” “may be completely or partially exempt.”

The Order is the newer text and the one TCEQ approved, and it repeals “any other On-site Sewage Facility (OSSF) Order” without naming the regulations. We have not settled which governs, and we will ask the county. Our land-buying septic checklist covers the rest of a lot purchase.

On a lot in a floodway, unburied parts (alarms, junction boxes, sprinklers, compressors) must sit 2 feet above the 100-year base flood elevation (Section 9H.5c).

Lake Tawakoni septic permits: the Sabine River Authority’s 2,000 feet

Within 2,000 feet of Lake Tawakoni’s project boundary, the Sabine River Authority (TCEQ agent 620150) permits septic systems on any size of tract, for a $300 residential license. Its 2012 Order says systems there must be permitted “regardless of tract/lot size,” including “tracts/lots larger than ten (10) acres.” Appeals go to the authority’s general manager, not to the county.

Its packet goes by mail to the Iron Bridge Division, PO Box 310, Point, Texas 75472, with a copy of the warranty deed. A professional engineer or licensed site evaluator must investigate the lot, commercial designs need an engineer, and a passed final inspection brings a “License to Operate.” After the first two years, the packet lets the owner of a single-family home’s aerobic system sign a contract within 30 days or maintain it personally.

Drip is commoner inside the band: 18 of the authority’s 55 Hunt County authorizations in 2025, against 11 of the county’s 593. The county’s Lake Tawakoni Zoning Ordinance reaches farther, to 5,000 feet from the authority’s lake property, per the Development Office. The septic line stays at 2,000 feet; beyond it, an unincorporated lot gets its permit from the county.

The Hunt County septic permit packet, turned in all at once

Hunt County will not take payment until every item on its checklist is turned in at once, and the property owner signs every document that needs a signature. The checklist, dated November 14, 2023, lists:

  1. The application, in the owner’s full name, with an email address (required).
  2. A 9-1-1 address for the installation site.
  3. A development permit ($40), from the same Health Department office.
  4. The deed, filed with the County Clerk and showing the filing stamp.
  5. A survey plat and the metes and bounds of the property.
  6. The original site evaluation, design and technical information sheet.

An aerobic system adds three more: the county’s original affidavit (the office prepares it from the metes and bounds), a maintenance contract signed by owner and installer, and the signed Homeowners Information form.

Pay by cash, check, money order or card (cards carry a fee); by check, write three: septic permit, development permit and County Clerk. Fees are non-refundable and good for one year. The checklist lists the development permit for every septic application; a May 2022 Development Office note requires it for land with “any amount of floodplain.”

Hunt County permit timeline: 30 days to decide, 5 days’ notice to inspect

The county Order gives the designated representative 30 days from submittal to approve or deny, and the installer must call for inspection at least five days before the system is ready. TCEQ’s permit FAQ sets the same 30-day limit statewide.

  1. Record the affidavit. Before construction is authorized, the owner records an affidavit in the county deed records stating that a system needing continuous maintenance is on the property and that the permit transfers with the land (Sections 9D.3 and 9D.4).
  2. Authorization to Construct. The checklist says it issues “within 30 days” if the paperwork is in order.
  3. Inspection. Ask too early and the county charges the full inspection fee anyway (9F.2a); fail it and the owner pays $75 for each re-inspection.
  4. Appeal, if denied. Within 30 days of the decision, appeal to the Development Support Committee, which has 30 days to decide; then, within 10 days, to the Commissioners Court, whose decision is final (Section 11).

State setback distances apply; the Order adds no setback table. Spray heads run on a timer from midnight to 5 a.m. “regardless of setbacks” (Order 9A.6, which calls for surface application heads; the 2020 regulations say “subsurface (purple pop-up) heads”). The state’s spray-area sizing rules are in our Texas spray field guide.

Who may install a septic system in Hunt County

The Order lets an unlicensed homeowner install a system “with approval and a permit from the designated authority,” but two other county documents say only a licensed installer may. Section 10.05.A of the 2020 regulations says an owner “may not install an OSSF unless licensed,” and the Development Office’s 2022 note says every system must be installed by a state-licensed installer. Ask the Health Department before doing the work yourself, and check any installer’s TCEQ license with our installer license guide.

Hunt County aerobic systems: registration, visits and who maintains them

Every aerobic system in Hunt County registers each year for $25 and, under contract, gets a provider inspection every four months; once inspected, it may be altered only under a county permit and inspection. A provider files each contract or renewal with the county within seven days of signing (Section 9F.3), and each inspection report must address “sludge levels in the pump tank and the condition of the spray area” (9F.7). That rule is the county’s Homeowners Information sheet, which counts moving a sprinkler or connecting a second home as an alteration.

State rule 30 TAC 285.7(d)(4) gives a single-family owner a choice at the end of the initial two-year service policy: sign a new contract or maintain the system personally. Hunt County’s papers disagree on whether the second option exists here:

  • Owner maintenance allowed: Order Section 9F.4, if the owner completes “an approved OSSF maintenance training course as specified by the Designated Representative,” and the recorded affidavit, “with the proper training.”
  • Contract always: the Homeowners Information sheet (“Maintenance contracts must be maintained at all times”), the application’s Q&A and the change-of-ownership form.

The county lists no approved course. What a provider contract should cover is in our aerobic maintenance contract guide. A buyer after the first two years has 30 days from transfer to sign a contract (9D.4e).

Hunt County septic rules for remodels, RV parks and holding tanks

An addition or remodel that raises a home’s value by 50% or more, or needs more capacity, brings the septic system up to the current Order, even when no new system is required. Replacing a system serving an existing facility takes 12 months of water-use records (9G.4).

  • RV and tiny-home communities: 60 gallons a day of capacity per RV; tiny homes of 600 square feet or less are sized like houses (9A.7).
  • Holding tanks: “generally prohibited,” allowed only by permit (9A.8).
  • Businesses: non-residential systems test effluent once a year for BOD and TSS, biochemical oxygen demand and total suspended solids (9F.5); the commercial permit is $500.

For installed prices, see our Texas new septic system cost guide.

Septic permits in Royse City, Caddo Mills, Greenville and Commerce

Royse City permits inside its own limits, the county runs Caddo Mills’ program, and Greenville and Commerce have no septic office of their own in TCEQ’s register.

OfficeTCEQ agent no.CoversContact
Hunt County Health Department, Environmental Services620107Unincorporated county and Poetry, outside the lake band2701 Johnson St., Greenville (TCEQ lists 2700) · (903) 408-4140 · health@huntcounty.net
Sabine River Authority620150Within 2,000 ft of Lake Tawakoni’s project boundaryLake Tawakoni office, 169 RS County Rd. 1480, Point · 903-598-2216; TCEQ lists (903) 878-2262
City of Royse City620337City limits141 W. Main St. · (972) 524-4710
City of Caddo Mills620388City limits, “administered by Hunt County”Hunt County Health Department
TCEQ Region 4620231Lists Greenville among cities it serves “if no interlocals”2309 Gravel Dr., Fort Worth · 817-588-5800

The county’s Order covers any city holding an intergovernmental contract with it, and inside a city it requires a letter stating that the city cannot supply sewer service. Caddo Mills’ own 2008 ordinance also requires a permit regardless of acreage and a one-acre lot. In Greenville or Commerce, ask the county about jurisdiction before ordering soil work. Hunt County’s soils are on its county septic page; other counties are in our Texas septic permit authorities guide and on the Texas index.

Hunt County septic permit FAQ

How much is a septic permit in Hunt County, Texas?

$335 for a home and $500 for a commercial system, on the county fee sheet dated June 1, 2022. Near Lake Tawakoni, the Sabine River Authority charges $300.

Do I need a septic permit on 10 acres in Hunt County?

The 2022 Order says yes; the county’s 2020 subdivision regulations still list the state’s ten-acre exemption. Inside the Sabine River Authority’s lake zone, a permit is required on any tract.

How long does a Hunt County septic permit take?

Up to 30 days from a complete application, under the county Order and state rules.

Can I install my own septic system in Hunt County?

The 2022 Order allows an unlicensed owner to install with the county’s approval and a permit, but the 2020 regulations and the Development Office require a licensed installer.

What is the minimum lot size for a septic system in Hunt County?

One acre, with one house per acre. Smaller lots of record need county approval.

Who issues septic permits in Greenville, Texas?

Greenville is not a TCEQ authorized agent; TCEQ lists its Region 4 office for Greenville “if no interlocals.” Ask the Hunt County Health Department whether an agreement covers an address.

Sources & Methodology

On November 9, 2026 we read Hunt County’s septic fee sheet, its OSSF Order and TCEQ’s approval, its 2020 subdivision regulations, every form on its Septic Systems page, and its Environmental Services and Development Office pages. We also read TCEQ’s OARS register, the Sabine River Authority’s Order and packet, the Royse City and Caddo Mills ordinances, TCEQ’s 2024 and 2025 authorized-agent reports, its permit FAQ, and 30 TAC 285.3 and 285.7. The Order’s key pages were checked on the page images; the river authority and city ordinances and two county forms are scans we read with text recognition. Where the county’s documents disagree, we print each and conclude nothing until the Health Department answers by phone.

Authorities

Where to apply for a Hunt County septic permit.

Hunt County Authorized Agent

2700 JOHNSON ST GREENVILLE , TX, 75401
(903) 408-4140
Official OSSF septic permit information ↗

Before you start

Any new system or major repair needs authorization before construction starts. Emergency repair? Call the agent first — most offices fast-track failing-system fixes rather than letting sewage sit.

Hire a septic company in Hunt County.

The license-verified septic companies on our Hunt County page are each matched to TCEQ records, with phone numbers and license status.

Find Hunt County septic companies
Free septic company quotes

Get free quotes from verified Hunt County septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.