Skip to content
Nearby Septic — nearbyseptic.com · Verified septic directory · printed Nov 25, 2026
Texas › Matagorda County
Matagorda County, Texas

Septic companies in Matagorda County, Texas.

4 license-verified septic companies serve Matagorda County. Every listing is checked against TCEQ license records.

Updated August 16, 2026 · listings checked against TCEQ records Aug 8, 2026 – Oct 1, 2026

Matagorda County, at a glance
All Texas permit guides →
License-verified septic companies listed
4
Permitting authority
Matagorda County Authorized Agent
Providers

Matagorda County septic companies, verified first.

Each listing shows how it matched TCEQ records, with its license number and phone. Anything we could not match is labeled as such, never badged.

How listings are labeled
  • ✓ Tier 1 — License-matched
  • Tier 2 — Roster-matched
  • Tier 3 — Directory-sourced labeled “Unverified”
How we verify →

2 of 4 providers

GE
Geigle’s Utilities ✓ TCEQ Verified
Maintenance Provider · MP0000063  +  Installer II · OS0012769 · expired — checked Aug 8, 2026
Drain Field RepairSeptic InspectionSeptic RepairSeptic System Installation

Serving Calhoun, DeWitt, Goliad, Gonzales + 6 more

SU
Sure Nuff Septic Training ✓ TCEQ Verified
Installer II · OS0036858 · Active — checked Aug 9, 2026
Drain Field RepairSeptic InspectionSeptic RepairSeptic System Installation

Serving Matagorda

iOrganic order is verified-first then A–Z and is never sold; featured slots, when they exist, are labeled. Methodology

Get quotes from Matagorda County septic companies.

Pumping, an inspection, or fixing a septic system: tell us once and up to 3 verified Matagorda County septic companies get it. Free, no spam, delete anytime.

Get free septic company quotes
Permits

Septic permits in Matagorda County: who issues them.

Matagorda County Authorized Agent

Covers unincorporated County

2200 7th St, Ste 1, Bay City 77414
(979) 244-2717
bmoudy@CO.MATAGORDA.TX.US
Official septic permit information ↗

Septic permit fees, forms and process

New installs and major repairs need a permit from the local authorized agent — usually the county, sometimes a city — and the rules that bind are the local ones.

This county’s full guide is still in production — the authority contact shown here is the official source in the meantime.

All Texas permit guides

Local rules

What’s different in Matagorda County.

Four things decide what you can build and what it costs: zoning, environmental protections, power for aerobic systems, and the ground itself. We publish each one only where we have checked it — and say so plainly where the answer is “same as the rest of Texas”.

Zoning & land use

Matagorda County permits septic in the unincorporated county under its own Matagorda County On-Site Sewage Rules and Regulations. Texas designates a county an authorized agent only after the commissioners court adopts such an order and TCEQ approves it (Health and Safety Code § 366.031), and § 366.032(b) makes that order prevail wherever it is stricter than the state rules in 30 TAC Chapter 285. Read the order before siting a system.

Source: Matagorda County On-Site Sewage Rules and Regulations ↗ · retrieved Aug 7, 2026

Also: Texas Commission on Environmental Quality, OSSF authorized agent county lookup (OARS) — result for Matagorda County ↗ · retrieved Aug 7, 2026

Environmental protections

Nothing in Matagorda County changes this. Texas adds a separate approval path over the Edwards Aquifer recharge, transition and contributing zones, where TCEQ requires an Edwards Aquifer Protection Plan under 30 TAC Chapter 213. Elsewhere the Chapter 285 rules stand on their own.

How Texas permitting works

Checked against TCEQ, 30 TAC Chapter 213 (Edwards Aquifer), Subchapters A and B — Edwards Aquifer and Contributing Zone in Medina, Bexar, Comal, Kinney, Uvalde, Hays, Travis and Williamson Counties (chapter review date 8 March 2024) ↗ · retrieved Aug 7, 2026

Geology & soil

The dominant constraint here is clayey subsoil that water moves through too slowly (48.0% of rated soils), followed by flooding (42.9%). NRCS rates 76.3% of rated ground very limited for a standard soil absorption field, 58.8% for subsurface drip and 58.8% for surface application with disinfection. Where a conventional field will not pass, subsurface drip is usually the route that does.

Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database (SSURGO), queried via Soil Data Access (gSSURGO vintage 21 November 2025) ↗ · retrieved Aug 7, 2026

i3 of 4 local factors researched for this county so far. Each one is published with the authority it came from and the date we read it. Methodology

Get free quotesPermits
Free septic company quotes

Get free quotes from verified Matagorda County septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.