On the mapped Edwards Aquifer recharge zone, a new septic system must be designed and submitted by a professional engineer or professional sanitarian, on a lot of at least one acre per house, and its tank 50 feet and its drain field 150 feet from any cave, sinkhole or other recharge feature. Those rules sit in 30 TAC § 285.40 and apply only inside eight counties: Kinney, Uvalde, Medina, Bexar, Comal, Hays, Travis and Williamson. A separate TCEQ Edwards Aquifer protection plan, $650 for one house on under five acres, is needed only when no exemption fits; a landowner building their own house with no more than 20 percent of the lot paved or roofed is exempt.
| What the recharge zone adds | Rule | Figure |
|---|---|---|
| Who prepares the planning materials | 30 TAC § 285.40(b), § 285.5(a)(2)(E) | Engineer or professional sanitarian |
| Minimum lot | § 285.40(c)(1) | 1 acre (43,560 sq ft) per single-family dwelling |
| Tank to recharge feature | § 285.40(c)(2)(A) | 50 feet |
| Soil absorption system to recharge feature | § 285.40(c)(2)(B) | 150 feet |
| TCEQ plan fee, one home under 5 acres | TCEQ-0574 | $650 |
| TCEQ plan review | § 213.4(e) | 30 days to completeness, then 90 |
Only land TCEQ has mapped as recharge, transition or contributing zone inside the eight counties named in 30 TAC Chapter 213, and the map decides, not the county line. TCEQ says plainly that “only portions of the Edwards Aquifer are regulated,” and its Edwards Aquifer map viewer is the tool for a specific lot. The boundaries have moved before: effective July 2, 1984, TCEQ’s map metadata records that the recharge zone “was revised by deleting Kendall County” and adding parts of Hays and Kinney. Kendall, Bandera, Kerr and the other Hill Country counties not among the named eight are outside Chapter 213, whatever the geology under them; our Hill Country septic guide covers what rock does to a system there.
The three zones work differently:
A lot that straddles the contributing and recharge zones is handled as recharge zone: TCEQ’s plan workflow says such a site is treated “as if it were on the recharge zone,” as § 213.22(7) also provides.
The recharge zone changes who designs the system, how big the lot must be and how far the system stays from the openings that lead to the aquifer, and it leaves the choice of system type to the designer. Section 213.5(g) sends septic systems on the recharge zone back to Chapter 285, so the county or city that already permits septic systems still issues the permit. Chapter 213 even carves septic out of its own ban: percolating land application is prohibited on the recharge zone “except for licensed private sewage facilities” (§ 213.6(b)(1)).
Chapter 285 then adds these conditions for a new system:
We found no state rule requiring aerobic treatment, pressure dosing or any particular system type because a lot is on the recharge zone. We searched every section of Chapter 285 that mentions the aquifer. Local rules can require one, as Austin’s does below.
Section 285.40(f) also requires an owner who divides land into two or more residential lots with any part of a system on the recharge zone to tell each buyer, in writing, which lots are covered, that a permit and a notice of approval are required, and whether a TCEQ plan was applied for and approved.
Usually not, if you are building your own home and keep impervious cover at 20 percent of the lot or less, or if the lot is larger than five acres with one house on it. Those two routes come from the rule itself; TCEQ’s guidance for private residences adds two more.
| Situation | Plan needed? | Where it comes from |
|---|---|---|
| Owner building their own single-family home at 20% impervious cover or less | No, but temporary erosion controls are required | § 213.5(h)(2)-(4) |
| One single-family home on a lot larger than 5 acres | No; not a regulated activity | § 213.3(28)(B)(v), § 213.22(6)(B)(vi) |
| Home inside a master community with an approved plan | May not need its own | TCEQ Private Residences guidance |
| Over 20% impervious cover, offset by rainwater harvesting to 20% or less | May not need one | TCEQ Private Residences guidance |
| Contributing zone, disturbing under 5 acres, not part of a larger plan | No | § 213.21(b) |
| Teardown and rebuild of a single-family home | “May require” a plan | TCEQ Private Residences guidance |
| None of the above | Yes | TCEQ Private Residences guidance |
Impervious cover counts “rooftops, driveways, concrete pads, sheds, sidewalks,” in TCEQ’s list. Its worked example: a lot at 37 percent cover that harvests rain from 18 percent of it is treated as 19 percent. The § 213.5(h)(2) wording covers “an individual land owner who seeks to construct his/her own single-family residence”; a builder putting up a house to sell should ask TCEQ before relying on it.
A required plan must be approved before the county or city can issue the septic authorization to construct, and it carries its own fee, review clock and recording duty. Section 285.41(a) sets the order: the plan is approved first, then the permit.
Stacked end to end, the state clocks for a home that needs a plan are up to 120 days at TCEQ, then up to 30 days for the septic permit under § 285.3(c), and the authorization to construct is good for one year. Engineer, sanitarian and geoscientist fees are set by those professionals and appear in no regulator’s schedule. The system itself is priced in our new septic system cost guide.
Several local programs over the aquifer are stricter than Chapter 285, and the strictest ones are about lot size, design credentials and nitrogen. Each permitting office’s own guide has the fees and steps.
Not yet on the record. TCEQ last reviewed Chapter 213 in a quadrennial review effective March 8, 2024, and Sections 285.40 to 285.42 have not changed since June 13, 2001. TCEQ’s open septic rulemaking project lists Subchapter E among possible changes, “to reflect changes to 30 TAC Chapter 213,” but the project page still points to a September 2025 briefing and no proposal appears on TCEQ’s rule-status pages as of October 23, 2026. Our Texas septic rule changes tracker will carry it if a proposal is published.
Yes. Chapter 213 exempts licensed private sewage facilities from its recharge-zone ban on percolating land application, and § 213.5(g) sends them to Chapter 285, which allows them with an engineer’s or sanitarian’s planning materials, one acre per house and 50- and 150-foot buffers from recharge features.
Not if you are building your own house and keep impervious cover to 20 percent of the lot, or the lot is over five acres with one house. You still need temporary erosion controls during construction, and the county septic permit either way.
Check the lot on TCEQ’s Edwards Aquifer map viewer, then confirm with the permitting office. The viewer carries a disclaimer that it is not a survey, and § 285.41(b) names the county’s designated representative and any groundwater conservation district as sources for recharge-feature locations.
The recharge zone carries the septic-specific rules in § 285.40; the contributing zone does not. On the contributing zone, the only state trigger is Chapter 213’s five-acre disturbance threshold for a contributing-zone plan, though Comal County ties its own permit to that plan.
No state rule we found does. The designer chooses the system for the site; Austin requires nitrogen-reducing treatment on the recharge zone inside its jurisdiction.
$650 for one single-family home on under five acres, with up to 30 days for TCEQ to deem it complete and 90 days for technical review. Approval lasts two years unless substantial construction has begun.
Rule text for 30 TAC Chapters 213 and 285 comes from Cornell LII, read October 23, 2026; we walked each quoted subsection up to its section heading and checked rule histories against TCEQ’s own history files. TCEQ program pages, the TCEQ-0574 fee form and the TCEQ-0585 instructions were read the same day. County orders for Comal and Bexar are image scans; we ran text recognition on them. Travis County, City of Austin and San Antonio Water System documents were read on their own sites. Hays County lot sizes were read in the county’s own regulations (Table 10-1) on October 23, 2026, and match our Hays permit guide. Table X distances were read in TCEQ’s adopted 2023 rule text. Left open rather than guessed: whether the state ten-acre exemption applies on the recharge zone, and when TCEQ will propose changes to Sections 285.40 to 285.42.