Skip to content
Nearby Septic — nearbyseptic.com · Verified septic directory · printed Nov 24, 2026
Home › Septic Guides for Texas › Edwards Aquifer Septic Rules (2026): Recharge Zone Guide
Resources

Edwards Aquifer Septic Rules (2026): Recharge Zone Guide

On the mapped Edwards Aquifer recharge zone, a new septic system must be designed and submitted by a professional engineer or professional sanitarian, on a lot of at least one acre per house, and its tank 50 feet and its drain field 150 feet from any cave, sinkhole or other recharge feature. Those rules sit in 30 TAC § 285.40 and apply only inside eight counties: Kinney, Uvalde, Medina, Bexar, Comal, Hays, Travis and Williamson. A separate TCEQ Edwards Aquifer protection plan, $650 for one house on under five acres, is needed only when no exemption fits; a landowner building their own house with no more than 20 percent of the lot paved or roofed is exempt.

What the recharge zone addsRuleFigure
Who prepares the planning materials30 TAC § 285.40(b), § 285.5(a)(2)(E)Engineer or professional sanitarian
Minimum lot§ 285.40(c)(1)1 acre (43,560 sq ft) per single-family dwelling
Tank to recharge feature§ 285.40(c)(2)(A)50 feet
Soil absorption system to recharge feature§ 285.40(c)(2)(B)150 feet
TCEQ plan fee, one home under 5 acresTCEQ-0574$650
TCEQ plan review§ 213.4(e)30 days to completeness, then 90

Which properties fall under these rules?

Only land TCEQ has mapped as recharge, transition or contributing zone inside the eight counties named in 30 TAC Chapter 213, and the map decides, not the county line. TCEQ says plainly that “only portions of the Edwards Aquifer are regulated,” and its Edwards Aquifer map viewer is the tool for a specific lot. The boundaries have moved before: effective July 2, 1984, TCEQ’s map metadata records that the recharge zone “was revised by deleting Kendall County” and adding parts of Hays and Kinney. Kendall, Bandera, Kerr and the other Hill Country counties not among the named eight are outside Chapter 213, whatever the geology under them; our Hill Country septic guide covers what rock does to a system there.

The three zones work differently:

  • Recharge zone: where the Edwards formations reach the surface and “caves, sinkholes, faults, fractures, or other permeable features” let water in (§ 213.3(27)). Every septic-specific rule on this page applies here.
  • Transition zone: a band south and southeast of the recharge zone where faults in younger formations may also carry water down (§ 213.3(36)). Section 285.40 applies to the recharge zone and, in its own words, is “not intended to be applied to any other areas.”
  • Contributing zone: the upstream watershed that drains onto the recharge zone (§ 213.22(2)). A contributing-zone plan is triggered when work disturbs at least five acres, or less if it is part of “a larger common plan of development or sale” that will reach five (§ 213.21(b)).

A lot that straddles the contributing and recharge zones is handled as recharge zone: TCEQ’s plan workflow says such a site is treated “as if it were on the recharge zone,” as § 213.22(7) also provides.

What changes for the septic system itself

The recharge zone changes who designs the system, how big the lot must be and how far the system stays from the openings that lead to the aquifer, and it leaves the choice of system type to the designer. Section 213.5(g) sends septic systems on the recharge zone back to Chapter 285, so the county or city that already permits septic systems still issues the permit. Chapter 213 even carves septic out of its own ban: percolating land application is prohibited on the recharge zone “except for licensed private sewage facilities” (§ 213.6(b)(1)).

Chapter 285 then adds these conditions for a new system:

  • Professional planning materials. § 285.40(b) requires that “all planning materials shall be submitted to the permitting authority by a professional engineer or professional sanitarian,” and § 285.5(a)(2)(E) applies the same rule to “all applications for new OSSF construction within the Edwards Aquifer Recharge Zone.” A site evaluator’s report alone is not enough here; our site evaluation guide covers what that report contains.
  • One acre per house. § 285.40(c)(1). Under § 285.40(e), Kinney, Uvalde, Medina, Bexar and Comal lots recorded before March 26, 1974 are exempt from the acre minimum, as are Travis lots recorded before November 21, 1983, Hays lots before June 21, 1984 and Williamson lots before May 21, 1985. The same subsection warns that a TCEQ plan “may be required” for the house.
  • Distance from recharge features. 50 feet for any tank and 150 feet for a soil absorption system. Table X of the rules, as amended effective July 6, 2023, lists the rest of the recharge-feature row: 150 feet for spray, 100 or 150 feet for drip depending on the soil’s application rate, and 50 feet for lined evapotranspiration beds and watertight sewer pipe. The full statewide setback table is in our Texas septic setback guide.
  • River buffers in Uvalde County. No system within 75 feet of the banks of the Nueces, Dry Frio, Frio or Sabinal Rivers between the northern Uvalde County line and the recharge zone (§ 285.42(b)).
  • A stop-work rule. If a recharge feature turns up during construction, § 285.42(a) suspends “all regulated activities near the feature” immediately, requires notice to TCEQ, and calls for a plan “sealed, signed, and dated by a professional engineer” before work resumes.

We found no state rule requiring aerobic treatment, pressure dosing or any particular system type because a lot is on the recharge zone. We searched every section of Chapter 285 that mentions the aquifer. Local rules can require one, as Austin’s does below.

Section 285.40(f) also requires an owner who divides land into two or more residential lots with any part of a system on the recharge zone to tell each buyer, in writing, which lots are covered, that a permit and a notice of approval are required, and whether a TCEQ plan was applied for and approved.

Do you need an Edwards Aquifer protection plan for one house?

Usually not, if you are building your own home and keep impervious cover at 20 percent of the lot or less, or if the lot is larger than five acres with one house on it. Those two routes come from the rule itself; TCEQ’s guidance for private residences adds two more.

SituationPlan needed?Where it comes from
Owner building their own single-family home at 20% impervious cover or lessNo, but temporary erosion controls are required§ 213.5(h)(2)-(4)
One single-family home on a lot larger than 5 acresNo; not a regulated activity§ 213.3(28)(B)(v), § 213.22(6)(B)(vi)
Home inside a master community with an approved planMay not need its ownTCEQ Private Residences guidance
Over 20% impervious cover, offset by rainwater harvesting to 20% or lessMay not need oneTCEQ Private Residences guidance
Contributing zone, disturbing under 5 acres, not part of a larger planNo§ 213.21(b)
Teardown and rebuild of a single-family home“May require” a planTCEQ Private Residences guidance
None of the aboveYesTCEQ Private Residences guidance

Impervious cover counts “rooftops, driveways, concrete pads, sheds, sidewalks,” in TCEQ’s list. Its worked example: a lot at 37 percent cover that harvests rain from 18 percent of it is treated as 19 percent. The § 213.5(h)(2) wording covers “an individual land owner who seeks to construct his/her own single-family residence”; a builder putting up a house to sell should ask TCEQ before relying on it.

When a plan is required, what it adds

A required plan must be approved before the county or city can issue the septic authorization to construct, and it carries its own fee, review clock and recording duty. Section 285.41(a) sets the order: the plan is approved first, then the permit.

  • The septic letter inside the plan. If the house will use septic, the plan application must include a written statement from the local authorized agent “that the site is suitable for the use of private sewage facilities and will meet the special requirements” for the recharge zone (§ 213.5(b)(4)(F)(ii)). Talk to the county early, because its letter is part of TCEQ’s file.
  • Fee. TCEQ’s fee form charges $650 for one single-family dwelling on under five acres; multi-lot residential plans run from $1,500 to $10,000 by acreage, an exception request is $500 and an extension request $150. The fee is forfeited if the application is withdrawn or denied.
  • Review. TCEQ has 30 days to call an application complete or deficient and 90 more for technical review (§ 213.4(e)); each deficiency notice gives the applicant 14 days to respond, and a site visit is usual. Since October 16, 2023, Austin staff manage every Edwards application.
  • Geologic assessment. Required for regulated activities under § 213.5(b)(3), prepared by a licensed professional geoscientist, but “single-family residential subdivisions constructed on less than ten acres are exempt.” An assessment expires ten years after certification.
  • After approval. Record the approval in the county deed records within 30 days (§ 213.4(g)(1)), give TCEQ 48 hours’ notice before work starts (§ 213.5(f)(1)), and start substantial construction within two years or the approval expires (§ 213.4(h)). A low-density single-family site at 20 percent cover or less skips permanent stormwater controls, recorded in the deed.

Stacked end to end, the state clocks for a home that needs a plan are up to 120 days at TCEQ, then up to 30 days for the septic permit under § 285.3(c), and the authorization to construct is good for one year. Engineer, sanitarian and geoscientist fees are set by those professionals and appear in no regulator’s schedule. The system itself is priced in our new septic system cost guide.

County and city rules on top of the state’s

Several local programs over the aquifer are stricter than Chapter 285, and the strictest ones are about lot size, design credentials and nitrogen. Each permitting office’s own guide has the fees and steps.

  • Comal County. Its 2013 order requires a permit “regardless of acreage” and adds a contributing-zone step: where a plan is required under § 213.21, TCEQ must approve it “before an authorization to construct may be issued by Comal County.” The county also asked TCEQ for every plan approval letter issued for Comal developments. See the Comal County permit guide and Comal County directory.
  • Bexar County. The county’s 2006 order accepts designs only from an engineer or registered sanitarian, states there is “no exemption” for a home on ten acres or more, and requires a “Flood Zone/Edwards Aquifer Recharge Zone Certification” signed by the designer. San Antonio’s separate Aquifer Protection Ordinance caps single-family impervious cover at 30 percent inside the city and 15 percent in its extraterritorial jurisdiction over the recharge zone; we found no septic provision in it. Providers are on the Bexar County directory page.
  • Hays County. Its lot-size table sets minimums above the state acre on the recharge zone, from 1.5 acres for an advanced system on surface water to 5 acres for a conventional system on a private well, as our Hays County permit guide lays out row by row.
  • Travis County. Chapter 448 of the county code, effective July 16, 2024, makes one acre the minimum for any home on septic “regardless of whether the lot or tract is served by a public water supply,” on or off the aquifer, unless the lot is an older small lot exempted under 30 TAC § 285.4(b)(1). See the Travis County permit guide.
  • City of Austin. City Code Chapter 15-5 requires nitrogen-reducing treatment for new drain field systems on the recharge zone, within 75 feet of Lake Austin, and in parts of the Barton Springs contributing zone. Approved systems must show average annual total nitrogen of 20 mg/L or less, or no more than 11 pounds a year.
  • Medina and Williamson. Their offices’ rules are in the Medina County permit guide and the Williamson County permit guide.

Could these rules change?

Not yet on the record. TCEQ last reviewed Chapter 213 in a quadrennial review effective March 8, 2024, and Sections 285.40 to 285.42 have not changed since June 13, 2001. TCEQ’s open septic rulemaking project lists Subchapter E among possible changes, “to reflect changes to 30 TAC Chapter 213,” but the project page still points to a September 2025 briefing and no proposal appears on TCEQ’s rule-status pages as of October 23, 2026. Our Texas septic rule changes tracker will carry it if a proposal is published.

Edwards Aquifer septic FAQ

Can you have a septic system on the Edwards Aquifer recharge zone?

Yes. Chapter 213 exempts licensed private sewage facilities from its recharge-zone ban on percolating land application, and § 213.5(g) sends them to Chapter 285, which allows them with an engineer’s or sanitarian’s planning materials, one acre per house and 50- and 150-foot buffers from recharge features.

Do I need a WPAP to build one house on the recharge zone?

Not if you are building your own house and keep impervious cover to 20 percent of the lot, or the lot is over five acres with one house. You still need temporary erosion controls during construction, and the county septic permit either way.

How do I know if my property is on the recharge zone?

Check the lot on TCEQ’s Edwards Aquifer map viewer, then confirm with the permitting office. The viewer carries a disclaimer that it is not a survey, and § 285.41(b) names the county’s designated representative and any groundwater conservation district as sources for recharge-feature locations.

What is the difference between the recharge zone and the contributing zone for a septic system?

The recharge zone carries the septic-specific rules in § 285.40; the contributing zone does not. On the contributing zone, the only state trigger is Chapter 213’s five-acre disturbance threshold for a contributing-zone plan, though Comal County ties its own permit to that plan.

Does the recharge zone require an aerobic system?

No state rule we found does. The designer chooses the system for the site; Austin requires nitrogen-reducing treatment on the recharge zone inside its jurisdiction.

How much does an Edwards Aquifer protection plan cost, and how long does it take?

$650 for one single-family home on under five acres, with up to 30 days for TCEQ to deem it complete and 90 days for technical review. Approval lasts two years unless substantial construction has begun.

Sources & Methodology

Rule text for 30 TAC Chapters 213 and 285 comes from Cornell LII, read October 23, 2026; we walked each quoted subsection up to its section heading and checked rule histories against TCEQ’s own history files. TCEQ program pages, the TCEQ-0574 fee form and the TCEQ-0585 instructions were read the same day. County orders for Comal and Bexar are image scans; we ran text recognition on them. Travis County, City of Austin and San Antonio Water System documents were read on their own sites. Hays County lot sizes were read in the county’s own regulations (Table 10-1) on October 23, 2026, and match our Hays permit guide. Table X distances were read in TCEQ’s adopted 2023 rule text. Left open rather than guessed: whether the state ten-acre exemption applies on the recharge zone, and when TCEQ will propose changes to Sections 285.40 to 285.42.

Free septic company quotes

Get free quotes from verified septic companies.

Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.

Septic Quote Request

Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.