Verified against county records · page updated November 3, 2026 · rules change — confirm with the agent before applying
A new septic system anywhere in Ellis County’s permitting area costs $600 in county permit fees, on a tract of any size, and repairs, alterations and re-inspections cost $175. The county processes every application through its MyGovernmentOnline portal (its FAQ says you can also apply in person) and says permits “can take a minimum of three weeks to process and approve.” Six cities and one TCEQ regional office permit their own areas, so the first step is checking which office covers your address.
| Ellis County septic fee | Amount | Source |
|---|---|---|
| Any septic system (new) | $600 | Master Fee Schedule, effective Oct. 13, 2026 |
| Alteration, hook-to, re-inspection or repair | $175 | Same |
| Septic-related variance or appeal | $375 | Same |
| Misc. septic fees | $150 | Same; the schedule does not say what this covers |
| State fee per permit | $10 | Order Sec. 10; whether it is inside the $600 is not stated |
The four septic lines above are the whole published septic schedule; there is no separate commercial fee, plan-review fee or contract-filing fee on it. Commissioners amended the schedule on October 13, 2026, the date the document now carries, though its web address still says 2023.
What the schedule does and does not say:
For how Ellis compares with other counties, see our Texas septic permit fee guide.
The county’s Department of Development permits most of Ellis County; Waxahachie, Ennis, Red Oak, Ovilla, Cedar Hill and Grand Prairie each permit inside their own limits. TCEQ’s register also lists Midlothian among the cities its Region 4 office in Fort Worth serves where no local agreement exists.
| Office | TCEQ agent no. | Covers | Contact |
|---|---|---|---|
| Ellis County Department of Development | 620068 | The rest of the county (see note below) | 302 N. Monroe St., 2nd floor, Waxahachie · (972) 825-5200 |
| City of Waxahachie | 620069 | City limits | 408 S. Rogers St. · (469) 309-4026 |
| City of Ennis | 620234 | City limits | 108 W. Knox St. · (972) 878-1234 |
| City of Red Oak | 620458 | City limits | 101 S. Live Oak St. · (469) 218-7780 |
| City of Ovilla | 620070 | City limits | 105 Cockrell Hill Rd. · (972) 617-7262 |
| City of Cedar Hill | 620055 | City limits | 285 Uptown Blvd. · (972) 291-5126 |
| City of Grand Prairie | 620056 | City limits | 300 W. Main St. · (972) 237-8056 |
| TCEQ Region 4 | 620231 | Midlothian, per TCEQ’s list | 2309 Gravel Dr., Fort Worth · 817-588-5800 |
Two county documents describe the county’s reach differently. TCEQ’s register says “entire County except City of Midlothian and other AAs.” The county’s Order says it applies to “the unincorporated areas of Ellis County.” That leaves Ferris, Italy, Palmer, Maypearl and the county’s other small cities without a named office in the Order. If your lot is in one of them, call the county before you hire a designer. Cedar Hill, which straddles the Dallas County line, sets its own rule: new structures on septic need at least one acre, and every system is “permitted and inspected regardless of lot size or acreage tract.”
Our guide to Texas septic permit authorities explains how to find the office for any Texas address.
Ellis County requires a permit, an inspection and a professional design for every system on every tract, and it bars owners from installing their own. The Order was adopted February 6, 2024 and approved by TCEQ on March 28, 2024.
| Order section | Ellis County rule | State default |
|---|---|---|
| 9(a) | Permit, fee and inspection for any construction, alteration, extension or repair “regardless of the size of the tract of land” | No permit for a single home on 10+ acres meeting four conditions (ten-acre rule) |
| 9(a)(3), (4) | Design by a registered sanitarian or engineer; site evaluation only by an engineer or registered sanitarian who also holds a TCEQ site evaluator license | A TCEQ-licensed site evaluator or a professional engineer (site evaluation guide) |
| 9(c) | No owner installation unless the owner holds an installer license | A single-family owner may install on their own property |
| 9(f)(3) | Every spray system on a midnight-to-5 a.m. timer | Timer required only near a property line (spray field rules) |
The Order also sizes every new structure up to 1,500 square feet for at least 180 gallons a day, guest houses and RVs included. It sets no setback table of its own, so the state distances in our Texas septic setback guide apply.
A lot on septic needs one acre if it has public or private water service and two if it has its own well, and an added home on the lot needs a certification before it is permitted. The groundwater district, Prairielands, can approve a well lot under two acres, but the Order sets one acre as the floor. Prairielands’ own rules set no septic distance; they send well spacing to the state’s well-driller rules.
The county’s subdivision standards, last updated May 26, 2026, add two requirements that reach septic lots:
Every septic application goes through MyGovernmentOnline, and the county rejects an application whose invoice is not paid within five business days. The process, as the county lists it:
| Permit type | Documents the county asks for |
|---|---|
| Aerobic | Design, tech form, soil evaluation, a filed affidavit, an initial maintenance contract |
| Alteration | Design with alteration details; tech form if the design lacks them |
| Hook-to | Design of the existing system or uncovered tank lids; filed affidavit if conventional |
| Repair | Design of the existing system marking the location and description of the repairs |
The affidavit is filed online with the County Clerk, and the county will not accept one with “an incorrect address and legal description.” The county no longer links a standalone application form; the portal is the form. For portal account problems, MGO’s help desk is 1-866-957-3764, option 1.
State rules give a permitting authority 30 days to approve or deny an application (30 TAC § 285.3(c)). The county’s own estimate is “a minimum of three weeks.”
Aerobic and spray systems start under a maintenance contract filed with the application; after the state’s two-year initial policy, only a trained owner who files every report may go without one, and six months without reports ends that option. Section 9(d) lets an owner skip the contract after training by an installer or a county-approved homeowner course. Section 9(e) takes the option away after “six (6) consecutive months” without reports, and every report must include the pump tank’s sludge level and the spray area’s condition.
The county’s affidavit reads more strictly. It says the maintenance agreement “shall be in place for the lifetime of the on-site wastewater treatment system,” and that a seller will “request a transfer of the permit to operate” at sale. Read both before deciding to self-maintain, and ask the county which governs your system. Renewals are refused “unless all maintenance reports from the previous contract period have been submitted.” Our aerobic maintenance contract guide covers what a contract includes.
Businesses, churches and other non-home buildings on secondary treatment test every four months up to 500 gallons a day, and monthly with a flow meter above that.
When sewage is exposed above ground, the county can order the tank pumped immediately and gives the owner 10 days to start repairs, with fines of $150 to $500 for each day of non-compliance. That is Section 9(j). Appeals of a designated representative’s decision go to the Commissioners Court under Section 11; the fee is $375. Repairs themselves “must be performed by a TCEQ-licensed installer or maintenance provider,” the county’s FAQ says.
$600 for any new septic system, and $175 for a repair, alteration, hook-to or re-inspection, under the schedule effective October 13, 2026. A $10 state fee also applies to each permit; the county does not say whether it is included.
Yes. The Order requires an application, fee and inspection “regardless of the size of the tract of land,” so the state’s ten-acre exemption does not apply.
Only if you hold a TCEQ installer license. Section 9(c) bars owner installations otherwise, and the design must come from a registered sanitarian or engineer.
The county says “a minimum of three weeks.” State rules require a decision within 30 days of a complete application.
Waxahachie permits inside its city limits at 408 S. Rogers St.; TCEQ lists its Fort Worth regional office for Midlothian. Lots outside those limits in unincorporated Ellis County go to the county.
Yes, once the state’s two-year initial contract ends, after training by an installer or a county-approved course, as long as reports keep arriving. Six consecutive months without reports forfeits the option.
We read Ellis County’s Master Fee Schedule (effective October 13, 2026), its 2024 OSSF Order and TCEQ approval, its subdivision standards (May 26, 2026), the Department of Development’s permit, FAQ and regulation pages, the OSSF affidavit, TCEQ’s OARS register for Ellis County and Region 4, TCEQ’s 2025 report of systems by authorized agent, the City of Cedar Hill’s OSSF page, Prairielands Groundwater Conservation District’s notice and rules, and 30 TAC § 285.3, all on November 2, 2026. We found no current septic page for Waxahachie, Ennis, Red Oak or Midlothian and print no city fees. Questions the documents leave open are on our call list with the county. Compare a nearby county’s rules in the Hood County permit guide, or see what a new system costs in our Texas new septic system cost guide. Local companies are listed on the Ellis County septic page.
Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.
Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.