Verified against county records · page updated October 31, 2026 · rules change — confirm with the agent before applying
A new home septic system in Hood County needs a permit from Hood County Environmental Health that costs $475, on any size of tract, and the county doubles that fee for a system installed without one. Inside Granbury city limits the city permits instead. Lots created after February 25, 2014 cannot place a system within 200 feet of Lake Granbury or the Brazos River, and the county lets a trained homeowner maintain an aerobic system after its first two years.
Hood County Environmental Health is TCEQ authorized agent 620102 for “entire County (except City of Granbury),” and the City of Granbury is agent 620280 for its city limits.
Hood County Environmental Health (TCEQ Authorized Agent 620102)
5417 Acton Hwy., Suite 102, Granbury, TX 76049
Phone: (817) 579-3288 · Fax: (817) 579-3268 · Environmental@hoodcounty.texas.gov
Hours: weekdays 8:00 to noon and 1:00 to 4:00 (the county’s sheet; TCEQ’s register lists 7:30 to 12 and 1 to 4:30)
The county’s Order reaches every area “except for areas regulated under an existing Order, Ordinance or Resolution,” and TCEQ’s register for Hood County lists only three entries: the county, the city and TCEQ’s DFW regional office. Tolar, Lipan, DeCordova and the Hood County part of Cresson are not on it, so their addresses fall under the county. The Brazos River Authority is not on the list, and its lake FAQ says septic systems “are licensed and inspected by the county in which they reside.” The Texas permit authority guide explains how county and city agents divide a map.
Environmental Health charges $475 to install a new residential system and $310 for a modification; commercial permits run $510 to $750 by daily wastewater flow.
| Item | Fee |
|---|---|
| Residential, new system | $475 |
| Residential, modification | $310 |
| Commercial, 0 to 1,000 gallons per day | $510 |
| Commercial, 1,001 to 2,000 gallons per day | $610 |
| Commercial, 2,001 to 3,000 gallons per day | $650 |
| Commercial, 3,001 to 4,000 gallons per day | $700 |
| Commercial, 4,001 to 5,000 gallons per day | $750 |
| Re-inspection | $150 |
| In-ground swimming pool permit | $200 |
| Annual aerobic registration | $20 |
| Homeowner maintenance non-compliance | $50 |
| Maintenance provider non-compliance | $50 |
| System installed without a permit | Permit fee doubled, “no exceptions” |
The page carries no date, and the PDF fee schedule it links returned an error when we tried it. Section 10 of the Order adds that a $10 fee “will also be collected for each on-site sewage facility permit” for TCEQ; the fee page does not say whether $475 includes it. A separate line sits on the Development department’s schedule: “ON-SITE PERMIT: $200.00 (Permit Obtained from Environmental Health Dept.).” The county’s development regulations use that name for a different document, a placard the Director of Development approves before any “building construction or earth disturbing activity” and that stays posted at the site. Ask both offices which permits a new build needs before budgeting. County-to-county comparisons are on the Texas septic permit fee table.
Four county rules decide whether a lot can carry a septic system at all, and the 200-foot water rule covers every lot created since February 25, 2014.
Distances to wells and the house come from state rule, not from the Upper Trinity Groundwater Conservation District: its well-spacing table measures only from other wells and property lines. The state distances are in our Texas septic setback guide.
The procedures sheet the county posted in June 2026 lists ten items, and a conventional trench needs only some of them.
Section 9(A) of the Order narrows who may do item 5: the evaluator must be a licensed site evaluator who also holds a Texas Professional Sanitarian license, or a licensed engineer, so a site evaluator license alone, which the state accepts, is not enough. A lot in or next to a FEMA Zone A or AE floodplain needs a sanitarian’s or engineer’s design under 9(B). The application packet lists the evaluators the county knows of and says it “cannot ethically recommend one individual over the others.” What an evaluation measures is in our site evaluation guide.
The county says it can decide system type and sizing within 30 days of a complete file, which matches the state’s 30-day limit in 30 TAC § 285.3(c).
An inspector visits the lot and checks the design against the evaluation and the county soil survey. A conventional system gets a permit to construct “if all the conditions are favorable.” The sheet says state rules require an alternative system wherever there is unsuitable soil, a restrictive layer such as hardpan clay or rock, or groundwater, and that a conventional trench needs two feet between its bottom and that layer. It says conditions in Hood County lean toward spray irrigation, low-pressure dosing and evapotranspiration beds. Nothing is built until the Authorization to Construct issues, and under state rule it is good for one calendar year. After a passing inspection of the installed system, a permit to operate follows. Signing the application also authorizes the county to re-inspect the system every five years.
Work on an existing residential system is billed at the $310 modification rate; the county publishes no separate repair fee. Adding an in-ground pool needs its own $200 permit, and altering the septic system to fit the pool takes a separate permit under Section 7.4. Violating the development regulations is a misdemeanor with a fine of $500 to $1,000 per offense, and each violation counts as a separate offense.
Granbury’s building official permits septic systems under Ordinance No. 97-563, and every new system there must be “designed and stamped by a registered professional engineer.” The ordinance also forbids a new system when any part of it would sit within 300 feet of an existing sewer line, unless the utility declines service in writing or connecting is shown to be infeasible. A system is inspected “prior to the final covering,” with at least five working days’ notice. Appeals go to the City Council. TCEQ’s register lists the city at 116 W. Bridge St., (817) 573-1114; the city’s own inspections page gives 682-279-8234 and inspections@granbury.org. We found no published city fee for a septic permit.
After the initial two-year service policy, Hood County lets a homeowner maintain the aerobic system on their own single-family home if they live there as a homestead and complete approved training. Order Section 9(C) accepts either the TCEQ maintenance technician training and test, or a homeowner course on the county’s list, which names Texas A&M AgriLife’s homeowner aerobic course. The owner files a training completion form with the $20 annual registration, reports test results every four months, and must sign a provider contract within ten days of notice after failing to report or after two citations in 12 months. Commercial and multifamily systems must keep a licensed provider. How a provider contract works is in our aerobic maintenance contract guide.
Every county document below is linked from the Environmental Health OSSF page; link the application packet, because two of the page’s standalone links return errors.
Septic companies licensed for Hood County work are on the Hood County directory page, and the full system budget is in the new septic system cost guide. Parker County, to the north, runs its own fee schedule and rules; see the Parker County permit guide.
Yes. Order Section 9(F) requires a permit “regardless of the lot or tract size,” so the state’s single-home exemption in 30 TAC § 285.3(f)(2) does not apply here. Our 10-acre rule guide explains the state version.
$475 for a new residential system and $310 for a modification, with commercial permits from $510 to $750. Re-inspections are $150, and a system installed without a permit pays double.
Not within 200 feet of the lake’s normal pool, the Brazos River or their tributaries, if the lot was created after February 25, 2014. Systems also cannot go in a FEMA-mapped floodplain on those lots, and older lots follow the state setbacks and the county’s flood rules.
Yes, after the first two years, if the home is your homestead and you complete approved training. You report results every four months and pay a $20 yearly registration; two citations in a year put you back on a paid contract.
The City of Granbury, through its building official, for addresses inside city limits. Every new system there needs a professional engineer’s stamp. Addresses outside the city go to Hood County Environmental Health.
Hood County’s Environmental Health and Development pages and documents were read on October 23, 2026; each is dated and linked in the page’s source list. The 2023 Order, the June 2026 procedures sheet and Granbury’s 1997 ordinance are image scans; we ran text recognition on them and checked the quoted sections against the scans. Agent records come from TCEQ’s OARS search for Hood County. State rule text comes from Cornell LII; the groundwater district’s rules from its own site. Left open rather than guessed: the date of the county’s fee page, whether $475 includes the $10 state fee, whether a new home pays Development’s $200 On-Site Permit as well, the City of Granbury’s septic fees, and how many inspections a permit includes.
Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.
Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.