When the Brazos River Authority wrote the Lake Granbury Watershed Protection Plan in 2010, it put the lake’s septic count at “an estimated 9,000 on-site sewage facilities” around the lake, “with absorption fields installed on small lots in close proximity to the lake.” Its modeling put septic systems at more than 99 percent of the likely bacteria sources in the Port Ridglea East and Ports O’ Call subdivisions. Hood County’s current rules read like an answer to that table.
Lake Granbury rules: 200 feet, and one subdivision off septic
A lot created after February 25, 2014 cannot hold a septic system in a FEMA floodplain or within 200 feet of Lake Granbury’s normal pool, the Brazos River, or their tributaries, whichever distance is greater. That is Section 9(D) of the county’s On-Site Sewage Facility Order, adopted August 8, 2023 and approved by TCEQ on September 6. The development regulations go further in one subdivision: Section 7.3 orders Port Ridglea East and Carla Court homes off septic and onto sewer, once the sewer certificate holder can take the connection, under any of six triggers, including a system permitted before 1995 or one with no permit on file; where that connection is required, the county may not issue a new septic authorization. Anywhere in the county’s half-mile Water Quality Districts, which run along Lake Granbury, the Brazos, the Paluxy, Squaw Creek Reservoir and four Brazos tributaries, a change of use, a lot split, a heavier load or a failure brings a surface inspection under Section 7.2.
Two permit offices, split at the Granbury city line
Hood County Environmental Health, TCEQ agent 620102, handles every address outside Granbury’s city limits; inside them, the city’s building official permits under a 1997 ordinance. Granbury’s ordinance asks more of a new system than the county does: an engineer must design and stamp every one. TCEQ’s register for Hood County lists those two agents and its own regional office, and no Brazos River Authority entry. Fees, forms and inspection steps are in the Hood County permit guide.
Owners can maintain their own aerobic unit
Hood County requires a permit on any acreage, yet it lets a qualified homeowner take over aerobic maintenance after the first two years.
Order section
What it means for an owner
9(F)
A permit before any installation “regardless of the lot or tract size,” so the state’s ten-acre exemption does not apply
9(C)
Self-maintenance after the two-year service policy, for an owner living there as a homestead who completes TCEQ technician training or a county-listed homeowner course
9(A)
Site evaluations only by a site evaluator who also holds a Texas Professional Sanitarian license, or a licensed engineer
An owner who self-maintains reports test results every four months, pays a $20 annual aerobic registration, and loses the option after two citations in 12 months. The aerobic maintenance contract guide covers what a paid contract must include for owners who keep one.
Why 85 percent of new systems spray or drip
Hood County authorized 576 new or replacement systems in 2025, and 491 of them disposed of treated effluent by spray or drip instead of a trench. TCEQ’s report by authorized agent lists 246 surface irrigation, 245 drip, 43 standard trench or bed, 40 leaching chamber and 2 low-pressure dosing systems; the City of Granbury added five more. The county has approved between 531 and 692 a year since 2019, against 249 in 2015, while its population reached 70,501 in July 2025, up 14.5 percent from the 2020 base.
The ground drives that mix. The watershed plan found that county soils “tend to require significant planning or modification” for a conventional system, and the soil card on this page puts bedrock close to the surface under 43.0 percent of rated soils. The aerobic system cost guide prices the aerobic systems that result and compares spray with drip.
Hood County Environmental Health: 5417 Acton Hwy., Suite 102, Granbury · (817) 579-3288 · weekdays 8 to noon and 1 to 4, per the county’s procedures sheet.
Providers
Hood County septic companies, verified first.
Each listing shows how it matched TCEQ records, with its license number and phone. Anything we could not match is labeled as such, never badged.
No matching septic companies verified in Hood County yet.
We only list providers we can check against TCEQ records — no padding, no scraped listings. Clear the filter to see every verified Hood County pro, or tell us what you need and we’ll route it to pros who serve the area.
iOrganic order is verified-first then A–Z and is never sold; featured slots, when they exist, are labeled. Methodology
Get quotes from Hood County septic companies.
Pumping, an inspection, or fixing a septic system: tell us once and up to 3 verified Hood County septic companies get it. Free, no spam, delete anytime.
New installs and major repairs need a permit from the local authorized agent — usually the county, sometimes a city — and the rules that bind are the local ones.
Our permit guide covers fees, required professionals and every step.
Four things decide what you can build and what it costs: zoning, environmental protections, power for aerobic systems, and the ground itself. We publish each one only where we have checked it — and say so plainly where the answer is “same as the rest of Texas”.
Zoning & land use
Hood County permits septic in the whole county (except the city of Granbury) under its own Hood County On-Site Sewage Facility Order — adopted by the commissioners court and approved by TCEQ, and controlling wherever it is stricter than 30 TAC Chapter 285 (Health and Safety Code § 366.032(b)). Texas grants county zoning power only in named places, and Hood County is one: Local Government Code Chapter 231, Subchapter K, covers development regulation county-wide.
Nothing in Hood County changes this.
Texas adds a separate approval path over the Edwards Aquifer recharge, transition and contributing zones, where TCEQ requires an Edwards Aquifer Protection Plan under 30 TAC Chapter 213. Elsewhere the Chapter 285 rules stand on their own.
The dominant constraint here is bedrock close to the surface (43.0% of rated soils), followed by so much gravel that effluent may reach groundwater before it is filtered (14.6%). NRCS rates 38.3% of rated ground very limited for a standard soil absorption field, 58.1% for subsurface drip and 9.3% for surface application with disinfection. Where a conventional field will not pass, surface application is usually the route that does.
Get free quotes from verified Hood County septic companies.
Pumping, an inspection, or help fixing a septic system: tell us once and we send it to up to 3 verified septic companies. Free, no spam, delete your request anytime.
Secure form. Sent over an encrypted connection to up to 3 verified septic companies. Never sold to data brokers, and you can have your request deleted anytime.